header

المسؤوليــَّة المدنيـَّـة عَــنْ أعمَــالِ مُقـــاوِل البِنَــاءِ : (Record no. 166400)

MARC details
000 -LEADER
fixed length control field 04842namaa22004211i 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - أخر تعامل مع التسجيلة
control field 20250223033228.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 240306s2023 ||| |||frm||| 000 0 ara d
040 ## - CATALOGING SOURCE
Original cataloguing agency EG-GICUC
Language of cataloging ara
Transcribing agency EG-GICUC
Modifying agency EG-GICUC
Description conventions rda
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title ara
Language code of summary or abstract ara
-- eng
049 ## - Acquisition Source
Acquisition Source إيداع
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 346
092 ## - LOCALLY ASSIGNED DEWEY CALL NUMBER (OCLC)
Classification number 346
Edition number 21
097 ## - Degree
Degree دكتـــــوراه‎
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Local Call Number Cai01.04.06.Ph.D.2023.سا.م
100 0# - MAIN ENTRY--PERSONAL NAME
Authority record control number or standard number سامـي مصطفــى عمَّــار الفرجانـي،
Preparation إعداد.
245 12 - TITLE STATEMENT
Title المسؤوليــَّة المدنيـَّـة عَــنْ أعمَــالِ مُقـــاوِل البِنَــاءِ :
Remainder of title دراســـة مقارنـــة /
Statement of responsibility, etc. الباحــث سامـي مصطفــى عمَّــار الفرجانـي ؛ إشراف سعيد سلمان جبر.
246 15 - VARYING FORM OF TITLE
Title proper/short title Civil Liability for the Work of the Building Contractor «Comparative Study»
264 #0 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice 2023.
300 ## - PHYSICAL DESCRIPTION
Extent 275 صفحة :
Dimensions 30 cm. +
Accompanying material CD.
336 ## - CONTENT TYPE
Content type term text
Source rda content
337 ## - MEDIA TYPE
Media type term Unmediated
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
502 ## - DISSERTATION NOTE
Dissertation note أطروحة (دكتوراه)-جامعة القاهرة، 2023.
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note ببليوجرافيا: صفحات 261-266.
520 ## - SUMMARY, ETC.
Summary, etc. من خلال دراسة عقد مقاولة البناء والأحكام المنظِّمة له، لقد اشترط المشرِّع الليبي في المادة (650) مدني مسئولية كل من المقاول والمهندس المعماري عن الأخطاء التي تقع أثناء تنفيذ الالتزام، وذلك في مواجهة رب العمل باعتباره طرف ضعيف في العقد وجعل مدة الضمان عشرة سنوات من وقوع التهدُّم أو ظهور العيب، فالتسلم من قِبَل رب العمل لا ينتهي بموجبه مسئولية المقاول بل تستمر لمدة عشرة سنوات من تاريخ التسلُّم وثلاثة سنوات من ظهور العيب ولا يستطيع المقاول التخلص من المسئولية إلَّا عن طريق السبب الأجنبي، في ظهور العيب تقوم المسئولية على المقاول وهي قرينة قانونية قاطعة لا يستطيع التخلص منها، وقد افترض المشرع التضامن بين كل من المهندس المعماري والمقاول في مواجهة رب العمل. ويقع التزام على عاتق المقاول وهو تسليم العمل إلى رب العمل حسب المواصفات وكراسة الشروط في العقد خاليًا من أية عيوب وعلى رب العمل إعطاء الأجر إلى المقاول بمجرد تمام التسلُّم من قِبَله بدون تحفُّظ.
520 ## - SUMMARY, ETC.
Summary, etc. Through the study of the construction contracting contract and the <br/>provisions regulating it, the Libyan legislator has stipulated in Article (650) <br/>civil the responsibility of both the contractor and the architect for errors that <br/>occur during the implementation of the obligation, in the face of the <br/>employer as a weak party to the contract and make the warranty period ten <br/>years from the occurrence of the demolition or the appearance of the defect, <br/>the receipt by the employer does not end under which the contractor's <br/>responsibility does not end, but continues for a period of ten years from the <br/>date of receipt and three years from the appearance of the defect The <br/>contractor can only get rid of liability through the foreign cause, in the <br/>appearance of the defect, the responsibility is based on the contractor, which <br/>is a conclusive legal presumption that he cannot get rid of, and the legislator <br/>has assumed solidarity between both the architect and the contractor in the <br/>face of the employer. The contractor has an obligation to deliver the work to <br/>the employer according to the specifications and the specifications in the <br/>contract free of any defects, and the employer must give the wage to the <br/>contractor as soon as it is received by him without reservation.
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Issues CD صدر ايضا كقرص مدمج
546 ## - LANGUAGE NOTE
Text Language النص بالعربية والملخص باللغة الإنجليزية والعربية.
650 #7 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element المسئولية المدنية
Source of heading or term qrmak
650 #7 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element البناء
Source of heading or term qrmak
General subdivision رقابة
653 #0 - INDEX TERM--UNCONTROLLED
Uncontrolled term مقاول البناء
-- المسؤلية المدنية
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name سعيد سلمان جبر
Relator term مشرف أطروحة.
900 ## - Thesis Information
Grant date 01-01-2023
Supervisory body سعيد سلمان جبر
Discussion body حســن حســين الـــبراوي
-- حمـــدي أحمــد سـعـــــد
Universities جامعة القاهرة
Faculties كلية الحقـــوق
Department قسم القانـــون المدنــي
905 ## - Cataloger and Reviser Names
Cataloger Name Yasmin
Reviser Names Afaf
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Edition 21
Suppress in OPAC No
Holdings
Source of classification or shelving scheme Home library Current library Date acquired Inventory number Full call number Barcode Date last seen Effective from Koha item type
Dewey Decimal Classification المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 06.03.2024 31040 Cai01.04.06.Ph.D.2023.سا.م 01010100031040000 06.03.2024 06.03.2024 Thesis