Strategies to Minimize the Impact of Cost Overruns Factors and Completion Delay of Mega Infrastructure Projects : (Record no. 170860)

MARC details
000 -LEADER
fixed length control field 08555namaa22004211i 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - أخر تعامل مع التسجيلة
control field 20250223033433.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250216s2024 |||a|||f |m|| 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloguing agency EG-GICUC
Language of cataloging eng
Transcribing agency EG-GICUC
Modifying agency EG-GICUC
Description conventions rda
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
Language code of summary or abstract eng
-- ara
049 ## - Acquisition Source
Acquisition Source Deposit
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.023
092 ## - LOCALLY ASSIGNED DEWEY CALL NUMBER (OCLC)
Classification number 658.023
Edition number 21
097 ## - Degree
Degree M.Sc
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Local Call Number Cai01.18.06.M.Sc.2024.Ma.S.
100 0# - MAIN ENTRY--PERSONAL NAME
Authority record control number or standard number Mamdouh Hussein Hamed Abo El Makarem,
Preparation preparation.
245 10 - TITLE STATEMENT
Title Strategies to Minimize the Impact of Cost Overruns Factors and Completion Delay of Mega Infrastructure Projects :
Remainder of title An Applied Study on Light Rail Transit New Capital Project in Egypt /
Statement of responsibility, etc. By Mamdouh Hussein Hamed Abo El Makarem; Under the Supervision of Prof. Dr. El Sayed Ahmed El Sherpieny, Dr. Basma Ezzat Hassan
246 15 - VARYING FORM OF TITLE
Title proper/short title استراتيجيات تقليل تأثير عوامل تجاوز التكلفة وتأخير تنفيذ مشروعات البنية التحتية الضخمة :
Remainder of title دراسة تطبيقية علي مشروع القطار الكهربي العاصمة الادارية الجديدة /
264 #0 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice 2024.
300 ## - PHYSICAL DESCRIPTION
Extent 126 Leaves :
Other physical details illustrations ;
Dimensions 30 cm. +
Accompanying material CD.
336 ## - CONTENT TYPE
Content type term text
Source rda content
337 ## - MEDIA TYPE
Media type term Unmediated
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Sc.)-Cairo University, 2024.
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography: pages 119-123.
520 ## - SUMMARY, ETC.
Summary, etc. Major Challenges faced in nowadays projects in both developed and developing countries are <br/>Schedule delay and cost overruns. Many types of research in the past have researched these delay <br/>and cost overruns issues in general & propose suitable measures to overcome this issue. The <br/>researcher found The Scarcity of studies that have been applied to the Electrified Public railway <br/>projects Despite the importance of the Subway and Railway Sector. The researcher has taken the <br/>Light rail Transit New Capital project (LRT) as a case study and the main objective were to Identify <br/>the Major factors that contribute to cost overruns in LRT project and to Identify the main factors <br/>causing Schedule delay in LRT project in addition to Identify the most effective strategies to <br/>minimize the effect of Cost overruns and schedule delays on completion of LRT project. <br/>The methodology adopted during research to validate the study is the literature review, case study, <br/>questionnaire survey. Results from each helped in validating research Assumptions and finding the <br/>most effective strategy to minimize the cost and Schedule Overruns. The Statistical Analysis for the <br/>Collected data from The Constructed Questionnaire that were distributed between All Parties <br/>involved in the LRT project “Client, Consultant and the Contractors “has proven positively the <br/>validity of Research Assumptions. As The Variation orders due to change in Project Design <br/>extremely cause Cost overruns and Schedule delays in addition to that Inaccurate estimates (for <br/>activities duration and cost) are major causes of LRT cost and schedule overruns. The statistical <br/>results prove also that Adequate Planning, controlling and proper management are most effective <br/>ways of minimizing LRT cost and schedule overruns. <br/> The research provides a strategy by integrating Pareto, Root Cause Analysis techniques that result <br/>in identifying the most effective methods to minimize Schedule and Cost Overruns Through Triple <br/>Actions the 1st is minimizing the Number of Variation orders, the 2nd Proceed in Techniques of <br/>Schedule Crashing and the 3rd enhancement of adequate Planning, Monitoring and Controlling <br/>During project execution. <br/>The research helps in integrating & providing knowledge of various practices that can be <br/>implemented in various aspects of construction to improve construction practices & reduce <br/>significant delay & cost overruns issues. The different strategies formulated by the author could <br/>help avoid & minimize risk & could be adopted in future project
520 ## - SUMMARY, ETC.
Summary, etc. تتمثل التحديات الرئيسية التي تواجه المشاريع في الوقت الحاضر في كل من البلدان المتقدمة والنامية في تأخير الجدول الزمني وتجاوز التكاليف. لقد بحثت العديد من أنواع الأبحاث في الماضي في قضايا التأخير وتجاوز التكاليف بشكل عام واقترحت التدابير المناسبة للتغلب على هذه المشكلة. وقد توصل الباحث إلى ندرة الدراسات التي تم تطبيقها على مشاريع السكك الحديدية العامة المكهربة رغم أهمية قطاع مترو الأنفاق والسكك الحديدية. اتخذ الباحث مشروع النقل بالسكك الحديدية الخفيفة بالعاصمة الجديدة (LRT) كدراسة حالة وكان الهدف الرئيسي هو تحديد العوامل الرئيسية التي تساهم في تجاوز التكاليف في مشروع LRT وتحديد العوامل الرئيسية التي تسبب تأخير الجدول الزمني لمشروع LRT بالإضافة إلى ذلك لتحديد الاستراتيجيات الأكثر فاعلية لتقليل تأثير تجاوز التكاليف وتأخير الجدول الزمني عند الانتهاء من مشروع LRT <br/>المنهجية المعتمدة أثناء البحث للتحقق من صحة الدراسة هي مراجعة الأدبيات، ودراسة الحالة، ومسح الاستبيان. ساعدت النتائج من كل منها في التحقق من صحة فرضيات البحث وإيجاد الإستراتيجية الأكثر فاعلية لتقليل التكلفة وتجاوز الجدول الزمني. لقد أثبت التحليل الإحصائي للبيانات التي تم جمعها من الاستبيان المعد والتي تم توزيعها بين جميع الأطراف المشاركة في مشروع” LRT العميل والاستشاري والمقاولين” بشكل إيجابي صحة فرضيات البحث. نظرًا لأن أوامر التغيير (VO) بسبب التغيير في تصميم المشروع تتسبب بشكل كبير في تجاوز التكاليف وتأخير الجدول الزمني، بالإضافة إلى أن التقديرات غير الدقيقة (لمدة الأنشطة وتكاليفها) تعد من الأسباب الرئيسية لتكلفة LRT وتجاوز الجدول الزمني. تثبت النتائج الإحصائية أيضًا أن التخطيط المناسب والمراقبة والإدارة السليمة هي أكثر الطرق فاعلية لتقليل تكلفة LRT وتجاوز الجدول الزمني.<br/> يوفر البحث استراتيجية من خلال دمج تقنيات باريتو وRCA التي تؤدي إلى تحديد الأساليب الأكثر فاعلية لتقليل تجاوزات الجدول والتكلفة من خلال إجراءات ثلاثية: الأول هو تقليل عدد أوامر التغيير، والثاني هو المضي قدمًا في تقنيات ضغط الجدول الزمني ، والثالث هو تحسين التخطيط والمراقبة والتحكم الكافي أثناء تنفيذ المشروع.<br/>يساعد البحث في دمج وتوفير المعرفة بالممارسات المختلفة التي يمكن تنفيذها في مختلف جوانب الانشاء لتحسين ممارسات تنفيذ المشروعات وتقليل مشكلات التأخير الكبيرة وتجاوز التكاليف. يمكن أن تساعد الاستراتيجيات المختلفة التي صاغها الباحث في تجنب المخاطر وتقليلها ويمكن اعتمادها في المشروعات المستقبلية.
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Issues CD Issued also as CD
546 ## - LANGUAGE NOTE
Text Language Text in English and abstract in Arabic & English.
650 #7 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Project Management
Source of heading or term qrmak
653 #0 - INDEX TERM--UNCONTROLLED
Uncontrolled term Light Rail Transit
-- New administrative Capital
-- Project Management
-- Schedule
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name El Sayed Ahmed El Sherpieny
Relator term thesis advisor.
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Basma Ezzat Hassan
Relator term thesis advisor.
900 ## - Thesis Information
Grant date 01-01-2024
Supervisory body El Sayed Ahmed El Sherpieny
-- Basma Ezzat Hassan
Universities Cairo University
Faculties Faculty of Graduate Studies for Statistical Research
Department Department of Operations Research and Management
905 ## - Cataloger and Reviser Names
Cataloger Name Nourhan
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Edition 21
Suppress in OPAC No
Holdings
Source of classification or shelving scheme Home library Current library Date acquired Inventory number Full call number Barcode Date last seen Effective from Koha item type
Dewey Decimal Classification المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 16.02.2025 90438 Cai01.18.06.M.Sc.2024.Ma.S. 01010110090438000 16.02.2025 16.02.2025 Thesis