Impact of cost overruns on infrastructure projects failures and effective cost management to reduce overruns / (Record no. 171288)

MARC details
000 -LEADER
fixed length control field 07936namaa22004211i 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - أخر تعامل مع التسجيلة
control field 20250413104913.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250325s2024 |||a|||f m||| 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloguing agency EG-GICUC
Language of cataloging eng
Transcribing agency EG-GICUC
Modifying agency EG-GICUC
Description conventions rda
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
Language code of summary or abstract eng
-- ara
049 ## - Acquisition Source
Acquisition Source Deposit
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.404
092 ## - LOCALLY ASSIGNED DEWEY CALL NUMBER (OCLC)
Classification number 658.404
Edition number 21
097 ## - Degree
Degree Ph.D
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Local Call Number Cai01.18.06.Ph.D.2024.Ah.I
100 0# - MAIN ENTRY--PERSONAL NAME
Authority record control number or standard number Ahmed Mohamed Nabil Ahmed,
Preparation preparation.
245 10 - TITLE STATEMENT
Title Impact of cost overruns on infrastructure projects failures and effective cost management to reduce overruns /
Statement of responsibility, etc. by Ahmed Mohamed Nabil Ahmed ; Supervision Prof. Dr. El Sayed Mohamed Khater, Dr. Basma Ezzat Hassan.
246 15 - VARYING FORM OF TITLE
Title proper/short title أثر تجاوز التكاليف على تعثر مشاريع البنية التحتية وإدارة التكلفة الفعالة للحد من تجاوز التكاليف /
264 #0 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice 2024.
300 ## - PHYSICAL DESCRIPTION
Extent 122 Leaves :
Other physical details illustrations ;
Dimensions 30 cm. +
Accompanying material CD.
336 ## - CONTENT TYPE
Content type term text
Source rda content
337 ## - MEDIA TYPE
Media type term Unmediated
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Ph.D)-Cairo University, 2024.
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography: pages 105-110.
520 ## - SUMMARY, ETC.
Summary, etc. The aim of this research is to investigate and analyze the reasons behind cost overruns in infrastructure projects compared to the planned costs. It also delves into establishing procedures for effectively monitoring and controlling project costs and measuring cost performance indicators throughout the project lifecycle. To achieve these goals, the research addresses three key questions that provide clarity on the research objectives. The research questions primarily focus on the estimation of risk costs for construction and infrastructure projects as an integral part of project knowledge areas. Additionally, the study analyzes the actual cost estimation methods employed by construction organizations and seeks to develop project cost management as an integrated part of all project knowledge areas, thereby enhancing the procedures for monitoring and controlling costs.<br/>To ensure comprehensive findings, the research employs the descriptive statistical analytical approach. The quantitative method involves a survey questionnaire administered to 103 respondents, while the qualitative approach involves analysis for case studies. By utilizing a descriptive approach, the research provides an in-depth exploration of the research questions from various perspectives. Based on a thorough literature review, three research hypotheses were formulated and subsequently validated during the discussion and analysis of the research questions. The results of the study affirm the positive validation of these hypotheses. The empirical findings reveal the following:<br/>- Accurate study of project costs during the initial stages of the project has a positive impact on controlling cost overruns.<br/>- Effective management of the project risk plan, including the identification, analysis, and control of risks, positively contributes to controlling cost overruns.<br/>- The utilization of the Earned Value Management (EVM) method throughout the project lifecycle serves as a strong indicator that assist in monitoring and controlling project cost overruns.<br/>In conclusion, this research provides valuable insights into the reasons for cost overruns in construction projects and infrastructure. It also offers practical procedures for monitoring and controlling project costs, as well as essential cost performance indicators throughout the project lifecycle. The research findings confirm the importance of managing project risk, conducting accurate cost estimations, and utilizing effective project management methods to prevent cost overruns.
520 ## - SUMMARY, ETC.
Summary, etc. إشارة إلى أحد أهم مستهدفات الأمم المتحدة للتنمية المستدامة وهو الهدف رقم 6 وذلك بالوصول الشامل لخدمات المياه والصرف الصحي وذلك لجميع سكان الأرض قبل حلول العام 2030م، ونظراً للمتطلبات المالية والاقتصادية اللازمة لإنشاء تلك المشاريع ضمن الميزانيات المعتمدة والمرصودة لها، بناءً عليه تهدف هذه الرسالة العلمية إلى دراسة وتحليل أسباب تجاوز التكاليف عن المخطط وذلك في مشاريع البنية التحتية (المياه والصرف الصحي). كما تسعى الرسالة العلمية إلى توصيات منهجية لمراقبة تكاليف المشروع بشكل فعال وقياس مؤشرات أداء التكلفة طوال دورة حياة المشروع، ولتحقيق تلك الأهداف تناول البحث ثلاثة أسئلة رئيسية والتي تركز في المقام الأول على تقدير التكاليف بدقة أثناء مرحلة الإعداد وقبل بدء المشروع، وكذلك تقدير تكاليف المخاطر المتوقعة، ومن ثم تعزيز إجراءات مراقبة التكاليف والتحكم فيها. ولضمان شمولية النتائج، تم إستخدام المنهج الوصفي الإحصائي التحليلي، حيث يتضمن الأسلوب الكمي استبيانًا مسحيًا تم إجراؤه على 103مستجيب، في حين يتضمن النهج النوعي تحليل دراسات الحالة باستخدام المنهج الوصفي، كما توفر الرسالة العلمية استكشافًا متعمقًا لأسئلة البحث من وجهات نظر مختلفة. واستناداً إلى مراجعة شاملة للأدبيات، تمت صياغة ثلاث فرضيات بحثية وتم التحقق من صحتها لاحقًا أثناء مناقشة وتحليل أسئلة البحث. وتؤكد نتائج الدراسة إيجابية تلك الفرضيات التي كشفت نتائجها ما يلي: <br/>- الدراسة الدقيقة لتكاليف المشروع خلال المراحل الأولى للمشروع لها الأثر الإيجابي في السيطرة على تجاوزات التكاليف.<br/>- الإدارة الفعالة لخطة مخاطر المشروع، بما في ذلك تحديد المخاطر وتحليلها والسيطرة عليها، تساهم بشكل إيجابي في السيطرة على تجاوزات التكاليف. <br/>- استخدام أسلوب إدارة القيمة المكتسبة طوال دورة حياة المشروع بمثابة مؤشر قوي يساعد في مراقبة ومراقبة تجاوزات تكاليف المشروع.<br/>وفي الختام، تقدم هذه الرسالة العلمية نتائج قيمة حول الأسباب الجوهرية لتجاوز التكاليف في مشاريع البنية التحتية (المياه والصرف الصحي) ومن ثم توصيات يمكن اتخذها للتحكم في تلك التجاوزات، كما يقدم إجراءات عملية لرصد ومراقبة تكاليف المشروع، بالإضافة إلى مؤشرات أداء التكلفة الأساسية طوال دورة حياة المشروع.
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Issues CD Issues also as CD.
546 ## - LANGUAGE NOTE
Text Language Text in English and abstract in Arabic & English.
650 #7 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Project Management
Source of heading or term qrmak
653 #0 - INDEX TERM--UNCONTROLLED
Uncontrolled term Cost Overrun
-- Cost Management
-- Infrastructure projects
-- Faulted Projects
-- Water and Wastewater Projects
-- Root Cause of Failure Project
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name El Sayed Mohamed Khater
Relator term thesis advisor.
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Basma Ezzat Hassan
Relator term thesis advisor.
900 ## - Thesis Information
Grant date 01-01-2024
Supervisory body El Sayed Mohamed Khater
-- Basma Ezzat Hassan
Universities Cairo University
Faculties Faculty of Graduate Studies for Statistical Research
Department Department of Project Management
905 ## - Cataloger and Reviser Names
Cataloger Name Shimaa
Reviser Names Huda
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Edition 21
Suppress in OPAC No
Holdings
Source of classification or shelving scheme Home library Current library Date acquired Inventory number Full call number Barcode Date last seen Effective from Koha item type
Dewey Decimal Classification المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 25.03.2025 90835 Cai01.18.06.Ph.D.2024.Ah.I 01010110090835000 25.03.2025 25.03.2025 Thesis