header

Using business process management in design coordination for construction projects / (Record no. 32140)

MARC details
000 -LEADER
fixed length control field 01667cam a2200313 a 4500
003 - CONTROL NUMBER IDENTIFIER
control field EG-GiCUC
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 101128s2010 ua d f m 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency EG-GiCUC
Language of cataloging eng
Transcribing agency EG-GiCUC
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
049 ## - LOCAL HOLDINGS (OCLC)
Holding library Deposite
097 ## - Thesis Degree
Thesis Level M.Sc
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number Cai01.13.05.M.Sc.2010.Ah.U
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Ahmed Mohamed Ibrahim Eldesouky
245 10 - TITLE STATEMENT
Title Using business process management in design coordination for construction projects /
Statement of responsibility, etc. Ahmed Mohamed Ibrahim Eldesouky ; Supervised Moheeb Elsaid Ibrahim , Mohamed Mahdy Marzouk
246 15 - VARYING FORM OF TITLE
Title proper/short title استخدام طريقة إدارة الإعمال فى تنسيق التصميم للمشروعات الإنشائية
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Cairo :
Name of publisher, distributor, etc. Ahmed Mohamed Ibrahim Eldesouky ,
Date of publication, distribution, etc. 2010
300 ## - PHYSICAL DESCRIPTION
Extent 94P. :
Other physical details charts ;
Dimensions 30cm
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 ## - SUMMARY, ETC.
Summary, etc. Business project management has been proposed as a solution to provide insight into potential problem areas and to identify address and eliminate them before they derail the project . The business process management interference in the design life cycle of a project is not to avoid all cases of miss - coordination and client requirements implementation ( which are impossible ) but to reorganize and manage them
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Additional physical form available note Issued also as CD
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Building project hierarchy
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Business process management
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Engineering consultancy firms
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Mohamed Mahdy Marzouk ,
Relator term
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Moheeb Elsaid Ibrahim ,
Relator term
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Fatma
Reviser Cataloger
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Nazla
Reviser Revisor
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Holdings
Source of classification or shelving scheme Not for loan Home library Current library Date acquired Full call number Barcode Date last seen Koha item type Copy number
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 11.02.2024 Cai01.13.05.M.Sc.2010.Ah.U 01010110054272000 22.09.2023 Thesis  
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة مخـــزن الرســائل الجـــامعية - البدروم 11.02.2024 Cai01.13.05.M.Sc.2010.Ah.U 01020110054272000 22.09.2023 CD - Rom 54272.CD