header

Risk management of infrastucture pipeline projects in Saudi Arabia / (Record no. 32712)

MARC details
000 -LEADER
fixed length control field 01452cam a2200301 a 4500
003 - CONTROL NUMBER IDENTIFIER
control field EG-GiCUC
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 110117s2010 ua d f m 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency EG-GiCUC
Language of cataloging eng
Transcribing agency EG-GiCUC
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
049 ## - LOCAL HOLDINGS (OCLC)
Holding library Deposite
097 ## - Thesis Degree
Thesis Level M.Sc
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number Cai01.13.05.M.Sc.2010.As.R
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Ashraf Saleh Aljuaid
245 10 - TITLE STATEMENT
Title Risk management of infrastucture pipeline projects in Saudi Arabia /
Statement of responsibility, etc. Ashraf Saleh Aljuaid ; Supervised Maheeb Elsaid
246 15 - VARYING FORM OF TITLE
Title proper/short title إدارة المخاطر بمشروعات خطوط المواسير بالمملكة العربية السعودية
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Cairo :
Name of publisher, distributor, etc. Ashraf Saleh Aljuaid ,
Date of publication, distribution, etc. 2010
300 ## - PHYSICAL DESCRIPTION
Extent 53P. :
Other physical details charts ;
Dimensions 30cm
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 ## - SUMMARY, ETC.
Summary, etc. Private investments in the field of infrastructure have increased rapidly over the past few decades . The primary goal of any construction project is to meet the owner's functional requirements . Moreover aesthetics may play a role depending upon the nature of the project . Nevertheless many construction projects fail to achieve their time quality and budget goals
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Additional physical form available note Issued also as CD
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Infrastucture pipeline projects
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Risk management
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Saudi Arabia
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Maheeb Elsaid ,
Relator term
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Fatma
Reviser Cataloger
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Nazla
Reviser Revisor
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Holdings
Source of classification or shelving scheme Not for loan Home library Current library Date acquired Full call number Barcode Date last seen Koha item type Copy number
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 11.02.2024 Cai01.13.05.M.Sc.2010.As.R 01010110054503000 22.09.2023 Thesis  
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة مخـــزن الرســائل الجـــامعية - البدروم 11.02.2024 Cai01.13.05.M.Sc.2010.As.R 01020110054503000 22.09.2023 CD - Rom 54503.CD