MARC details
000 -LEADER |
fixed length control field |
022210000a22003130004500 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
EG-GICUC |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
070103s2005 ua a f m 000 0 eng d |
040 ## - CATALOGING SOURCE |
Original cataloging agency |
EG-GICUC |
Language of cataloging |
eng |
Transcribing agency |
EG-GICUC |
041 0# - LANGUAGE CODE |
Language code of text/sound track or separate title |
Eng |
049 ## - LOCAL HOLDINGS (OCLC) |
Holding library |
Deposite |
097 ## - Thesis Degree |
Thesis Level |
M.Sc |
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC) |
Classification number |
Cai01.18.02.M.Sc.2005.Ma.S |
100 0# - MAIN ENTRY--PERSONAL NAME |
Personal name |
Manal Abd El kader Abd El fattah |
245 10 - TITLE STATEMENT |
Title |
Solving Planning Problems using Dimensional Modeling / |
Statement of responsibility, etc. |
Manal Abd El kader Abd El fattah ; Supervised Ibrahim Farag , Ali Hamid Elbastawisy |
246 15 - VARYING FORM OF TITLE |
Title proper/short title |
حل مشاكل التخطيط باستخدام نمذجة الابعاد |
260 ## - PUBLICATION, DISTRIBUTION, ETC. |
Place of publication, distribution, etc. |
Cairo : |
Name of publisher, distributor, etc. |
Manal Abd El kader Abd El fattah , |
Date of publication, distribution, etc. |
2005 |
300 ## - PHYSICAL DESCRIPTION |
Extent |
106P : |
Other physical details |
ill ; |
Dimensions |
30cm |
502 ## - DISSERTATION NOTE |
Dissertation note |
Thesis (M.Sc.) - Cairo University - Institute Of Statistical Studies and Research (ISSR) - Department Of Computer and Information Sciences |
520 ## - SUMMARY, ETC. |
Summary, etc. |
Today Egyptian industry has been affected by many problems that caused industry obstacles that have significant impact on the Egyptian economy One of basic common problems to all manufactures is planning Planning types contain long - range planning , medium - range planning , and short - range planning ; each of them is complex by nature and need to be decomposed into smaller sub problems that are less complex , more structured and easier to be solved Capacity Requirements Planning (CRP) is one of the medium - range planning problems CRP is a detailed comparison of the capacity required by production plans versus the available production capacity and it determines how much labor and machine resources are required to accomplish the production plans If adequate capacity cannot be established , corrective actions should be taken When available capacity is insufficient despite corrective actions , the production planner reviews relative priorities and , working with marketing and production responsible , makes the difficult decisions required in revising the schedul |
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE |
Additional physical form available note |
Issued also as CD |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
planning |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Problems |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Solving |
700 0# - ADDED ENTRY--PERSONAL NAME |
Personal name |
Ali Hamid Elbastawisy , |
Relator term |
|
700 0# - ADDED ENTRY--PERSONAL NAME |
Personal name |
Ibrahim Farag , |
Relator term |
|
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN) |
Cataloger |
Aml |
Reviser |
Cataloger |
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN) |
Cataloger |
Esam |
Reviser |
Revisor |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Source of classification or shelving scheme |
Dewey Decimal Classification |
Koha item type |
Thesis |