header

Planning of telecommunication towers projects using fuzzy subtractive modeling and computer simulation / (Record no. 45591)

MARC details
000 -LEADER
fixed length control field 01779cam a2200301 a 4500
003 - CONTROL NUMBER IDENTIFIER
control field EG-GiCUC
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 140401s2013 ua dh f m 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency EG-GiCUC
Language of cataloging eng
Transcribing agency EG-GiCUC
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
049 ## - LOCAL HOLDINGS (OCLC)
Holding library Deposite
097 ## - Thesis Degree
Thesis Level M.Sc
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number Cai01.13.05.M.Sc.2013.Mo.P
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Mohamed Alsayed Alaraby Alsayed Ahmed
245 10 - TITLE STATEMENT
Title Planning of telecommunication towers projects using fuzzy subtractive modeling and computer simulation /
Statement of responsibility, etc. Mohamed Alsayed Alaraby Alsayed Ahmed ; Supervised Mohamed Mahdy Marzouk
246 15 - VARYING FORM OF TITLE
Title proper/short title تخطيط مشروعات ابراج الاتصالات باستخدام اسلوبى التجمعات الغائمة والمحاكاة
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Cairo :
Name of publisher, distributor, etc. Mohamed Alsayed Alaraby Alsayed Ahmed ,
Date of publication, distribution, etc. 2013
300 ## - PHYSICAL DESCRIPTION
Extent 60 P. :
Other physical details charts , facsimiles ;
Dimensions 30cm
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 ## - SUMMARY, ETC.
Summary, etc. The planning process of telecommunication towers projects start from the design phase and end with the construction phase . This thesis present a fuzzy subtractive model to estimate the cost of telecommunication towers using the four parameters of design process which are height tilt wind load and antenna subjected load . On the other hand simulation models are presented to plan the construction of telecommunication towers project to use as a decision making tool considering all the sites conditions that these types of projects can meet
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Additional physical form available note Issued also as CD
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Computer simulation
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Fuzzy subtractive clustering
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Telecommunication towers
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Mohamed Mahdy Marzouk ,
Relator term
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Nazla
Reviser Revisor
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Soheir
Reviser Cataloger
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Holdings
Source of classification or shelving scheme Not for loan Home library Current library Date acquired Full call number Barcode Date last seen Koha item type Copy number
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 11.02.2024 Cai01.13.05.M.Sc.2013.Mo.P 01010110062275000 22.09.2023 Thesis  
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة مخـــزن الرســائل الجـــامعية - البدروم 11.02.2024 Cai01.13.05.M.Sc.2013.Mo.P 01020110062275000 22.09.2023 CD - Rom 62275.CD