header

Developing new approach for measuring construction project performance / (Record no. 61067)

MARC details
000 -LEADER
fixed length control field 01785cam a2200337 a 4500
003 - CONTROL NUMBER IDENTIFIER
control field EG-GiCUC
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250223031728.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 170604s2016 ua h f m 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency EG-GiCUC
Language of cataloging eng
Transcribing agency EG-GiCUC
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
049 ## - LOCAL HOLDINGS (OCLC)
Holding library Deposite
097 ## - Thesis Degree
Thesis Level M.Sc
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number Cai01.13.05.M.Sc.2016.Kh.D
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Khaled Aboulata Mohamed Aboulata
245 10 - TITLE STATEMENT
Title Developing new approach for measuring construction project performance /
Statement of responsibility, etc. Khaled Aboulata Mohamed Aboulata ; Supervised Moheeb Elsaid Ibrahim , Ahmed Saad
246 15 - VARYING FORM OF TITLE
Title proper/short title تطوير طريقة جديدة لقياس الأداء فى مشروعات التشييد
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Cairo :
Name of publisher, distributor, etc. Khaled Aboulata Mohamed Aboulata ,
Date of publication, distribution, etc. 2016
300 ## - PHYSICAL DESCRIPTION
Extent 119 P. :
Other physical details facsimiles ;
Dimensions 30cm
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 ## - SUMMARY, ETC.
Summary, etc. This research discussed six different approaches used for measuring performance of construction projects to illustrate differences between approaches through detailed study of each approach objective, theory, advantages and limitations. Also, a practical example was provided to apply each approach on real project. Finally, research recommended a new approach which may be used to evaluate the current performance, identify the opportunity for necessary improvement and estimate future performance with its probability of occurrence
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Additional physical form available note Issued also as CD
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Construction management
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Performance evaluation
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Project appraisal
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Ahmed Saad ,
Relator term
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Moheeb Elsaid Ibrahim ,
Relator term
856 ## - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://172.23.153.220/th.pdf">http://172.23.153.220/th.pdf</a>
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Nazla
Reviser Revisor
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Samia
Reviser Cataloger
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Holdings
Source of classification or shelving scheme Not for loan Home library Current library Date acquired Full call number Barcode Date last seen Koha item type Copy number
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 11.02.2024 Cai01.13.05.M.Sc.2016.Kh.D 01010110071775000 22.09.2023 Thesis  
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة مخـــزن الرســائل الجـــامعية - البدروم 11.02.2024 Cai01.13.05.M.Sc.2016.Kh.D 01020110071775000 22.09.2023 CD - Rom 71775.CD