The effect of risk allocation on minimizing disputes in construction projects in Egypt / (Record no. 61931)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 01705cam a2200301 a 4500 |
003 - CONTROL NUMBER IDENTIFIER | |
control field | EG-GiCUC |
005 - DATE AND TIME OF LATEST TRANSACTION | |
control field | 20250223031754.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 170813s2016 ua d f m 000 0 eng d |
040 ## - CATALOGING SOURCE | |
Original cataloging agency | EG-GiCUC |
Language of cataloging | eng |
Transcribing agency | EG-GiCUC |
041 0# - LANGUAGE CODE | |
Language code of text/sound track or separate title | eng |
049 ## - LOCAL HOLDINGS (OCLC) | |
Holding library | Gift |
097 ## - Thesis Degree | |
Thesis Level | M.Sc |
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC) | |
Classification number | Cai01.34.M.Sc.2016.Re.E |
100 0# - MAIN ENTRY--PERSONAL NAME | |
Personal name | Reem Yasser Mahmoud Ahmed |
245 14 - TITLE STATEMENT | |
Title | The effect of risk allocation on minimizing disputes in construction projects in Egypt / |
Statement of responsibility, etc. | Reem Yasser Mahmoud Ahmed ; Supervised Ayman Hamdy Nassar |
260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
Place of publication, distribution, etc. | Cairo : |
Name of publisher, distributor, etc. | Reem Yasser Mahmoud Ahmed , |
Date of publication, distribution, etc. | 2016 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | 105 Leaves : |
Other physical details | charts ; |
Dimensions | 30cm |
502 ## - DISSERTATION NOTE | |
Dissertation note | Thesis (M.Sc.) - German University - Faculty of Postgraduate Studies and Scientific Research - Department of Civil Engineering |
520 ## - SUMMARY, ETC. | |
Summary, etc. | Risks are generally defined as the variations in the possible outcomes that exist in nature for given situtions. Construction projects in Egypt always experience high levels of risks and uncertainties due to their complex and dynamic environments. This, in turn impacts projects in both time and cost and causes numerous disputes between parties. Usually, project participants allocate risks by aversion where owners tend to shift risks to the primary contractor, who in turn transfers them to the subcontractiors. As a result of this, risks are not necessarily allocated reallocated to the party that is best able to manage them efficiently and effectively |
653 #4 - INDEX TERM--UNCONTROLLED | |
Uncontrolled term | Disputes |
653 #4 - INDEX TERM--UNCONTROLLED | |
Uncontrolled term | Risk allocation |
653 #4 - INDEX TERM--UNCONTROLLED | |
Uncontrolled term | Risk management |
700 0# - ADDED ENTRY--PERSONAL NAME | |
Personal name | Ayman Hamdy Nassar , |
Relator term | |
856 ## - ELECTRONIC LOCATION AND ACCESS | |
Uniform Resource Identifier | <a href="http://172.23.153.220/th.pdf">http://172.23.153.220/th.pdf</a> |
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN) | |
Cataloger | Nazla |
Reviser | Revisor |
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN) | |
Cataloger | Samia |
Reviser | Cataloger |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Source of classification or shelving scheme | Dewey Decimal Classification |
Koha item type | Thesis |
Source of classification or shelving scheme | Not for loan | Home library | Current library | Date acquired | Full call number | Barcode | Date last seen | Koha item type |
---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | المكتبة المركزبة الجديدة - جامعة القاهرة | قاعة الثقاقات الاجنبية - الدور الثالث | 11.02.2024 | Cai01.34.M.Sc.2016.Re.E | 01010110072440000 | 05.07.2024 | Thesis |