MARC details
000 -LEADER |
fixed length control field |
02264cam a2200301 a 4500 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
EG-GiCUC |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
180719s2018 ua de f m 000 0 eng d |
040 ## - CATALOGING SOURCE |
Original cataloging agency |
EG-GiCUC |
Language of cataloging |
eng |
Transcribing agency |
EG-GiCUC |
041 0# - LANGUAGE CODE |
Language code of text/sound track or separate title |
eng |
049 ## - LOCAL HOLDINGS (OCLC) |
Holding library |
Deposite |
097 ## - Thesis Degree |
Thesis Level |
M.Sc |
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC) |
Classification number |
Cai01.13.13.M.Sc.2018.Wa.A |
100 0# - MAIN ENTRY--PERSONAL NAME |
Personal name |
Waleed Mohamed Diaa Eldeen Elrashidy |
245 10 - TITLE STATEMENT |
Title |
Application of decision support tools in managing gas pipeline construction projects under unpredictable risks / |
Statement of responsibility, etc. |
Waleed Mohamed Diaa Eldeen Elrashidy ; Supervised Tamer F. Abdelmaguid |
246 15 - VARYING FORM OF TITLE |
Title proper/short title |
تطبيقات أدوات دعم القرار في ادارة مشروعات انشاء خطوط الغاز في وجود مخاطر لا يمكن التنبؤ بها |
260 ## - PUBLICATION, DISTRIBUTION, ETC. |
Place of publication, distribution, etc. |
Cairo : |
Name of publisher, distributor, etc. |
Waleed Mohamed Diaa Eldeen Elrashidy , |
Date of publication, distribution, etc. |
2018 |
300 ## - PHYSICAL DESCRIPTION |
Extent |
59 P. : |
Other physical details |
charts , plans ; |
Dimensions |
30cm |
502 ## - DISSERTATION NOTE |
Dissertation note |
Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Mechanical Design and Production |
520 ## - SUMMARY, ETC. |
Summary, etc. |
Planning and following up for project schedules are integral parts of sound management which help to achieve project objectives. Although the process of making decisions in that regard is standardized to a great extent, the strategies which are used to cope with the effect of uncertain events due to external factors depend on project circumstances. In Egypt, managing natural gas pipeline construction projects faced many challenges due to unpredictable risks and major security issues that faced Egypt in recent years. This research discusses the effect of external factors on the schedules of three ongoing gas pipeline construction projects and demonstrates how to deal with their negative effect using suitable decision support tools. This thesis demonstrates that a well-defined management process, with the aid of suitable decision support tools, helps in decreasing the effect of unfortunate events on the schedules for gas pipeline construction projects in Egypt |
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE |
Additional physical form available note |
Issued also as CD |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Multi criteria decisions making |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Project risk analysis |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Project scheduling |
700 0# - ADDED ENTRY--PERSONAL NAME |
Personal name |
Tamer Farouk Abdelmaguid , |
Relator term |
|
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN) |
Cataloger |
Enas |
Reviser |
Cataloger |
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN) |
Cataloger |
Nazla |
Reviser |
Revisor |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Source of classification or shelving scheme |
Dewey Decimal Classification |
Koha item type |
Thesis |