header

Critical factors effecting on delay time in residential construction projects / (Record no. 67177)

MARC details
000 -LEADER
fixed length control field 02098cam a2200337 a 4500
003 - CONTROL NUMBER IDENTIFIER
control field EG-GiCUC
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250223032035.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180828s2018 ua d f m 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency EG-GiCUC
Language of cataloging eng
Transcribing agency EG-GiCUC
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
049 ## - LOCAL HOLDINGS (OCLC)
Holding library Deposite
097 ## - Thesis Degree
Thesis Level M.Sc
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number Cai01.13.05.M.Sc.2018.Da.C
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Dalia Ahmed Elbadawy Mahmoud Kshaf
245 10 - TITLE STATEMENT
Title Critical factors effecting on delay time in residential construction projects /
Statement of responsibility, etc. Dalia Ahmed Elbadawy Mahmoud Kshaf ; Supervised Moheeb Elsaid Ibrahim , Saeed Ahmed Alsheikh
246 15 - VARYING FORM OF TITLE
Title proper/short title العوامل الحرجة التي تؤثر على التأخير في المشاريع السكنية
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Cairo :
Name of publisher, distributor, etc. Dalia Ahmed Elbadawy Mahmoud Kshaf ,
Date of publication, distribution, etc. 2018
300 ## - PHYSICAL DESCRIPTION
Extent 93 P. :
Other physical details charts ;
Dimensions 30cm
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 ## - SUMMARY, ETC.
Summary, etc. Time is considered one of the most powerful factors that leads to the success of any projects, sometimes leads to legal disputes between parties. Therefore, it is essential to study and analyze causes of construction delay to determine the party which is responsible for the delay or if the reasons are beyond the control of any of the parties.This research presents a list of the most important construction delay causes according to interviews. Statistical analysis is carried out using analysis of variance (Kruskal-wallis) method to test delay causes, obtained from interviews. In the end a road map that includes the reasons for the delay, according to their importance and proposals of the parties ( The owner {u2013} The contractor {u2013} The consultant ) were made to avoid delays in the project , or at least to reduce them
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Additional physical form available note Issued also as CD
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Analyze
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Construction delays
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Interview
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Moheeb Elsaid Ibrahim ,
Relator term
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Saeed Ahmed Alsheikh ,
Relator term
856 ## - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://172.23.153.220/th.pdf">http://172.23.153.220/th.pdf</a>
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Enas
Reviser Cataloger
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Nazla
Reviser Revisor
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Holdings
Source of classification or shelving scheme Not for loan Home library Current library Date acquired Full call number Barcode Date last seen Koha item type Copy number
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 11.02.2024 Cai01.13.05.M.Sc.2018.Da.C 01010110075425000 22.09.2023 Thesis  
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة مخـــزن الرســائل الجـــامعية - البدروم 11.02.2024 Cai01.13.05.M.Sc.2018.Da.C 01020110075425000 22.09.2023 CD - Rom 75425.CD