header

Assessing water resources needs and availability for the proposed development corridor / (Record no. 67675)

MARC details
000 -LEADER
fixed length control field 01757cam a2200325 a 4500
003 - CONTROL NUMBER IDENTIFIER
control field EG-GiCUC
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180926s2018 ua dh f m 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency EG-GiCUC
Language of cataloging eng
Transcribing agency EG-GiCUC
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
049 ## - LOCAL HOLDINGS (OCLC)
Holding library Deposite
097 ## - Thesis Degree
Thesis Level M.Sc
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number Cai01.13.05.M.Sc.2018.Sa.A
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Sally Ahmed Abdelmonem Elawady
245 10 - TITLE STATEMENT
Title Assessing water resources needs and availability for the proposed development corridor /
Statement of responsibility, etc. Sally Ahmed Elawady ; Supervised Mohamed Morsi Atrees , Ahmed Emam Hassan , Hesham Bekhit Mohamed
246 15 - VARYING FORM OF TITLE
Title proper/short title تقييم الاحتياجات المائية و الموارد المتاحة لمقترح مشروع ممر التنمية
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Cairo :
Name of publisher, distributor, etc. Sally Ahmed Abdelmonem Elawady ,
Date of publication, distribution, etc. 2018
300 ## - PHYSICAL DESCRIPTION
Extent 127 P. :
Other physical details charts , facsimiles ;
Dimensions 30cm
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 ## - SUMMARY, ETC.
Summary, etc. Development corridor has a vision for developing west desert of Egypt but also many debates were raised against this project. One of the main components that could terminate the project is the availability of water resources. This research will be an assessment for water resources need and availability for the Development corridor project to introduce more feasible project that reinforce the strategy of horizontal expansion necessary to face population growth
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Additional physical form available note Issued also as CD
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Development corridor
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Farouk Elbaz
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Water resources
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Ahmed Emam Hassan ,
Relator term
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Hesham Bekhit Mohamed ,
Relator term
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Mohamed Morsi Atrees ,
Relator term
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Nazla
Reviser Revisor
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Samia
Reviser Cataloger
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Holdings
Source of classification or shelving scheme Not for loan Home library Current library Date acquired Full call number Barcode Date last seen Koha item type Copy number
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 11.02.2024 Cai01.13.05.M.Sc.2018.Sa.A 01010110076021000 22.09.2023 Thesis  
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة مخـــزن الرســائل الجـــامعية - البدروم 11.02.2024 Cai01.13.05.M.Sc.2018.Sa.A 01020110076021000 22.09.2023 CD - Rom 76021.CD