MARC details
000 -LEADER |
fixed length control field |
01979cam a2200313 a 4500 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
EG-GiCUC |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
180927s2018 ua f m 000 0 eng d |
040 ## - CATALOGING SOURCE |
Original cataloging agency |
EG-GiCUC |
Language of cataloging |
eng |
Transcribing agency |
EG-GiCUC |
041 0# - LANGUAGE CODE |
Language code of text/sound track or separate title |
eng |
049 ## - LOCAL HOLDINGS (OCLC) |
Holding library |
Deposite |
097 ## - Thesis Degree |
Thesis Level |
M.Sc |
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC) |
Classification number |
Cai01.13.05.M.Sc.2018.Ha.C |
100 0# - MAIN ENTRY--PERSONAL NAME |
Personal name |
Hani Samir Soliman Ghattas |
245 10 - TITLE STATEMENT |
Title |
Cost contingency estimation for highway constuction projects in Egypt / |
Statement of responsibility, etc. |
Hani Samir Soliman Ghattas ; Supervised Moheeb Elsaid Ibrahem , Ahmed Saad Eldin Mohamed |
246 15 - VARYING FORM OF TITLE |
Title proper/short title |
تقدير تكلفة الطوارئ لمشاريع تشييد الطرق السريعة فى مصر |
260 ## - PUBLICATION, DISTRIBUTION, ETC. |
Place of publication, distribution, etc. |
Cairo : |
Name of publisher, distributor, etc. |
Hani Samir Soliman Ghattas , |
Date of publication, distribution, etc. |
2018 |
300 ## - PHYSICAL DESCRIPTION |
Extent |
85 , 100 P. ; |
Dimensions |
30cm |
502 ## - DISSERTATION NOTE |
Dissertation note |
Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering |
520 ## - SUMMARY, ETC. |
Summary, etc. |
The problem arose because the groups responsible for the cost estimation lack a definition of contingency and its estimating techniques, and this causes problems of increasing the cost of the project. Cost control problems due to error and inaccuracy of the basic cost estimate. This paper reviewed the previous research related to estimating the cost of emergency projects for the construction of the Egyptian highways, taking into account the main factors affecting the highway projects. The study produced a set of values for contingency reserves as percentage of the estimated budget distributed to various project sites, contract types and project components for use as reference when estimating emergency reserves. Risk reserves are calculated on the basis of calculating the probability of risk and its impact on the risk profile |
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE |
Additional physical form available note |
Issued also as CD |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Contingency |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Cost |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Risk |
700 0# - ADDED ENTRY--PERSONAL NAME |
Personal name |
Ahmed Saad Eldin Mohamed , |
Relator term |
|
700 0# - ADDED ENTRY--PERSONAL NAME |
Personal name |
Moheeb Elsaid Ibrahem , |
Relator term |
|
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN) |
Cataloger |
Nazla |
Reviser |
Revisor |
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN) |
Cataloger |
Samia |
Reviser |
Cataloger |