header

Cost contingency estimation for highway constuction projects in Egypt / (Record no. 67682)

MARC details
000 -LEADER
fixed length control field 01979cam a2200313 a 4500
003 - CONTROL NUMBER IDENTIFIER
control field EG-GiCUC
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180927s2018 ua f m 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency EG-GiCUC
Language of cataloging eng
Transcribing agency EG-GiCUC
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
049 ## - LOCAL HOLDINGS (OCLC)
Holding library Deposite
097 ## - Thesis Degree
Thesis Level M.Sc
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number Cai01.13.05.M.Sc.2018.Ha.C
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Hani Samir Soliman Ghattas
245 10 - TITLE STATEMENT
Title Cost contingency estimation for highway constuction projects in Egypt /
Statement of responsibility, etc. Hani Samir Soliman Ghattas ; Supervised Moheeb Elsaid Ibrahem , Ahmed Saad Eldin Mohamed
246 15 - VARYING FORM OF TITLE
Title proper/short title تقدير تكلفة الطوارئ لمشاريع تشييد الطرق السريعة فى مصر
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Cairo :
Name of publisher, distributor, etc. Hani Samir Soliman Ghattas ,
Date of publication, distribution, etc. 2018
300 ## - PHYSICAL DESCRIPTION
Extent 85 , 100 P. ;
Dimensions 30cm
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 ## - SUMMARY, ETC.
Summary, etc. The problem arose because the groups responsible for the cost estimation lack a definition of contingency and its estimating techniques, and this causes problems of increasing the cost of the project. Cost control problems due to error and inaccuracy of the basic cost estimate. This paper reviewed the previous research related to estimating the cost of emergency projects for the construction of the Egyptian highways, taking into account the main factors affecting the highway projects. The study produced a set of values for contingency reserves as percentage of the estimated budget distributed to various project sites, contract types and project components for use as reference when estimating emergency reserves. Risk reserves are calculated on the basis of calculating the probability of risk and its impact on the risk profile
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Additional physical form available note Issued also as CD
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Contingency
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Cost
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Risk
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Ahmed Saad Eldin Mohamed ,
Relator term
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Moheeb Elsaid Ibrahem ,
Relator term
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Nazla
Reviser Revisor
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Samia
Reviser Cataloger
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Holdings
Source of classification or shelving scheme Not for loan Home library Current library Date acquired Full call number Barcode Date last seen Koha item type Copy number
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 11.02.2024 Cai01.13.05.M.Sc.2018.Ha.C 01010110076026000 22.09.2023 Thesis  
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة مخـــزن الرســائل الجـــامعية - البدروم 11.02.2024 Cai01.13.05.M.Sc.2018.Ha.C 01020110076026000 22.09.2023 CD - Rom 76026.CD