Framework for evaluating demolition processes using pull-planning and BIM / (Record no. 68743)

MARC details
000 -LEADER
fixed length control field 03120cam a2200313 a 4500
003 - CONTROL NUMBER IDENTIFIER
control field EG-GiCUC
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 181126s2018 ua dh f m 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency EG-GiCUC
Language of cataloging eng
Transcribing agency EG-GiCUC
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
049 ## - LOCAL HOLDINGS (OCLC)
Holding library Deposite
097 ## - Thesis Degree
Thesis Level M.Sc
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number Cai01.13.05.M.Sc.2018.Ah.F
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Ahmed Mohamed Ahmed Lotfy Elmaraghy
245 10 - TITLE STATEMENT
Title Framework for evaluating demolition processes using pull-planning and BIM /
Statement of responsibility, etc. Ahmed Mohamed Ahmed Lotfy Elmaraghy ; Supervised Mohamed Mahdy Marzouk , Hans Voordijk
246 15 - VARYING FORM OF TITLE
Title proper/short title إطارلتقويم عمليات الهدم باستخدام التخطيط الاستباقى ونمذجة معلومات المنشآت
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Cairo :
Name of publisher, distributor, etc. Ahmed Mohamed Ahmed Lotfy Elmaraghy ,
Date of publication, distribution, etc. 2018
300 ## - PHYSICAL DESCRIPTION
Extent 110 P. :
Other physical details charts , facsimiles ;
Dimensions 30cm
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 ## - SUMMARY, ETC.
Summary, etc. The static nature of existing building assets is not serving the continuous change in the functional requirements of their end-users. Therefore, buildings undergo renovation or reconstruction, which require the total or partial demolition of the buildings, to meet these new requirements. This results in more virgin materials pumped into the construction industry to substitute the wasted ones, leading to an increase in the construction and demolition wastes. In addition, the materials abandoning the circular loop leave an adverse impact on the environment. This research proposes an approach based on pull-planning concept to ensure the early involvement of key participants in the decision-making process. This approach is implemented within a proposed framework that explains the sequencing of deconstruction planning phases required before actual demolition activities take place. The resulting framework shall encourage the selective dismantling of building elements based on the customer needs. Building information modelling capabilities in deconstruction planning are investigated. The deficiencies in building information modelling as a platform for deconstruction planning are then analyzed. Semi-structured interviews are conducted in the Dutch construction sector, to assess the practicality of the pull-planning criteria. The proposed framework aids in decreasing the uncertainties involved in demolition projects. The framework can be implemented on a national level to automate the deconstruction projects and optimize the extraction of salvaged building elements. The recovery option for such elements and their final destiny can be secured a sufficient time before their dismantling from their original locations. A case study of an office building is presented in order to demonstrate the practical features of the proposed model
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Additional physical form available note Issued also as CD
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Building information modelling (BIM)
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Circular Economy
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Selective Dismantling
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Hans Voordijk ,
Relator term
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Mohamed Mahdy Marzouk ,
Relator term
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Nazla
Reviser Revisor
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Shimaa
Reviser Cataloger
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Holdings
Source of classification or shelving scheme Not for loan Home library Current library Date acquired Full call number Barcode Date last seen Koha item type Copy number
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 11.02.2024 Cai01.13.05.M.Sc.2018.Ah.F 01010110076430000 22.09.2023 Thesis  
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة مخـــزن الرســائل الجـــامعية - البدروم 11.02.2024 Cai01.13.05.M.Sc.2018.Ah.F 01020110076430000 22.09.2023 CD - Rom 76430.CD