header

Effect of contemporary building techniques and new materials upon time , quality and cost of building construction / (Record no. 71111)

MARC details
000 -LEADER
fixed length control field 020250000a22003250004500
003 - CONTROL NUMBER IDENTIFIER
control field EG-GICUC
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250223032234.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 061016s2005 ua a f m 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency EG-GICUC
Language of cataloging eng
Transcribing agency EG-GICUC
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title Eng
049 ## - LOCAL HOLDINGS (OCLC)
Holding library Deposite
097 ## - Thesis Degree
Thesis Level M.Sc
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number Cai01.13.02.M.Sc.2005.Ah.E.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Ahmed Mohammed Mahmoud Eweda
245 10 - TITLE STATEMENT
Title Effect of contemporary building techniques and new materials upon time , quality and cost of building construction /
Statement of responsibility, etc. Ahmed Mohammed Mahmoud Eweda ; Supervised Mohammed Medhat Dorra , Medhat Abd El Meguid ElShazli
246 15 - VARYING FORM OF TITLE
Title proper/short title تاثير نظم البناء المعاصرة و المواد الحديثة على سرعة و جودة و تكلفة تنفيذ المباني
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Cairo :
Name of publisher, distributor, etc. Ahmed Mohammed Mahmoud Eweda ,
Date of publication, distribution, etc. 2005
300 ## - PHYSICAL DESCRIPTION
Extent 248P :
Other physical details ill ;
Dimensions 30cm
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Sc.) - Cairo University - Faculty Of Engineering - Department Of Architectural Engineering
520 ## - SUMMARY, ETC.
Summary, etc. Building industry , which is about 12in hundred of the total industry in such a country , is not fully mechanized because it did not follow the building industrial techniquesThree main factors are greatly affected by the new building materials and techniques , time cost and qualityThese three factors are controlling and judging success and failure of technologyStudying building techniques and new materials in relation to time cost and quality is the main concern of the studyThree main factors are greatly affected by the new building materials and techniques , time , cost and qualityThose three factors are controlling and judging success and failure of construction industry
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Additional physical form available note Issued also as CD
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term building industrial techniques
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Building industry
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Medhat Abd El Meguid ElShazli ,
Relator term
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Mohammed Medhat Dorra ,
Relator term
856 ## - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://172.23.153.220/th.pdf">http://172.23.153.220/th.pdf</a>
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Amira
Reviser Cataloger
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Esam
Reviser Revisor
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Holdings
Source of classification or shelving scheme Not for loan Home library Current library Date acquired Full call number Barcode Date last seen Koha item type Copy number
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 11.02.2024 Cai01.13.02.M.Sc.2005.Ah.E. 01010110044913000 22.09.2023 Thesis  
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة مخـــزن الرســائل الجـــامعية - البدروم 11.02.2024 Cai01.13.02.M.Sc.2005.Ah.E. 01020110044913000 22.09.2023 CD - Rom 44913.CD