header

Measuring construction performance in public private partnership projects / (Record no. 72510)

MARC details
000 -LEADER
fixed length control field 02161cam a2200301 a 4500
003 - CONTROL NUMBER IDENTIFIER
control field EG-GiCUC
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 190619s2018 ua d f m 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency EG-GiCUC
Language of cataloging eng
Transcribing agency EG-GiCUC
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
049 ## - LOCAL HOLDINGS (OCLC)
Holding library Deposite
097 ## - Thesis Degree
Thesis Level Ph.D
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number Cai01.13.05.Ph.D.2018.Em.M
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Emad Fayez Gaid Abdelsaid
245 10 - TITLE STATEMENT
Title Measuring construction performance in public private partnership projects /
Statement of responsibility, etc. Emad Fayez Gaid Abdelsaid ; Supervised Mohamed Mahdy Marzouk
246 15 - VARYING FORM OF TITLE
Title proper/short title قياس مستوى أداء مشروعات شراكة القطاع العام والخاص
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Cairo :
Name of publisher, distributor, etc. Emad Fayez Gaid Abdelsaid ,
Date of publication, distribution, etc. 2018
300 ## - PHYSICAL DESCRIPTION
Extent 130 P. :
Other physical details charts ;
Dimensions 30cm
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Ph.D.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 ## - SUMMARY, ETC.
Summary, etc. PPP projects has different phases and stakeholders needed to measure and assess the level of success and achievements of their targets. Performance measurement is a crucial component of business management. It is necessary to have a well-designed measurement system has the ability to check and monitor the performance and support the long-term strategic decisions for the company. key performance indicators (KPIs) present one of the best methods to measure and improve performance evaluation. The main target of this research to identify and prioritize KPIs that measure and evaluate PPP projects and contractors{u2019} performance in Egypt taking into consideration the size of the organization and the type of the project. Exploratory Factor Analysis (EFA) method has been used to analyze and determines the interrelationships between the set of indicators. the research introduces set of mathematical models to measure the overall project performance. Two prediction models are created to predict the cost at completion of the construction project
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Additional physical form available note Issued also as CD
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Concession
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Key Performance Indicators
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Public Private Partnership
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Mohamed Mahdy Marzouk ,
Relator term
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Nazla
Reviser Revisor
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Shimaa
Reviser Cataloger
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Holdings
Source of classification or shelving scheme Not for loan Home library Current library Date acquired Full call number Barcode Date last seen Koha item type Copy number
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 11.02.2024 Cai01.13.05.Ph.D.2018.Em.M 01010110078452000 22.09.2023 Thesis  
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة مخـــزن الرســائل الجـــامعية - البدروم 11.02.2024 Cai01.13.05.Ph.D.2018.Em.M 01020110078452000 22.09.2023 CD - Rom 78452.CD