MARC details
000 -LEADER |
fixed length control field |
02161cam a2200301 a 4500 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
EG-GiCUC |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
190619s2018 ua d f m 000 0 eng d |
040 ## - CATALOGING SOURCE |
Original cataloging agency |
EG-GiCUC |
Language of cataloging |
eng |
Transcribing agency |
EG-GiCUC |
041 0# - LANGUAGE CODE |
Language code of text/sound track or separate title |
eng |
049 ## - LOCAL HOLDINGS (OCLC) |
Holding library |
Deposite |
097 ## - Thesis Degree |
Thesis Level |
Ph.D |
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC) |
Classification number |
Cai01.13.05.Ph.D.2018.Em.M |
100 0# - MAIN ENTRY--PERSONAL NAME |
Personal name |
Emad Fayez Gaid Abdelsaid |
245 10 - TITLE STATEMENT |
Title |
Measuring construction performance in public private partnership projects / |
Statement of responsibility, etc. |
Emad Fayez Gaid Abdelsaid ; Supervised Mohamed Mahdy Marzouk |
246 15 - VARYING FORM OF TITLE |
Title proper/short title |
قياس مستوى أداء مشروعات شراكة القطاع العام والخاص |
260 ## - PUBLICATION, DISTRIBUTION, ETC. |
Place of publication, distribution, etc. |
Cairo : |
Name of publisher, distributor, etc. |
Emad Fayez Gaid Abdelsaid , |
Date of publication, distribution, etc. |
2018 |
300 ## - PHYSICAL DESCRIPTION |
Extent |
130 P. : |
Other physical details |
charts ; |
Dimensions |
30cm |
502 ## - DISSERTATION NOTE |
Dissertation note |
Thesis (Ph.D.) - Cairo University - Faculty of Engineering - Department of Civil Engineering |
520 ## - SUMMARY, ETC. |
Summary, etc. |
PPP projects has different phases and stakeholders needed to measure and assess the level of success and achievements of their targets. Performance measurement is a crucial component of business management. It is necessary to have a well-designed measurement system has the ability to check and monitor the performance and support the long-term strategic decisions for the company. key performance indicators (KPIs) present one of the best methods to measure and improve performance evaluation. The main target of this research to identify and prioritize KPIs that measure and evaluate PPP projects and contractors{u2019} performance in Egypt taking into consideration the size of the organization and the type of the project. Exploratory Factor Analysis (EFA) method has been used to analyze and determines the interrelationships between the set of indicators. the research introduces set of mathematical models to measure the overall project performance. Two prediction models are created to predict the cost at completion of the construction project |
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE |
Additional physical form available note |
Issued also as CD |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Concession |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Key Performance Indicators |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Public Private Partnership |
700 0# - ADDED ENTRY--PERSONAL NAME |
Personal name |
Mohamed Mahdy Marzouk , |
Relator term |
|
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN) |
Cataloger |
Nazla |
Reviser |
Revisor |
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN) |
Cataloger |
Shimaa |
Reviser |
Cataloger |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Source of classification or shelving scheme |
Dewey Decimal Classification |
Koha item type |
Thesis |