The use of productivity loss quantification methodologies for construction claims in Egypt / by Waheed Eldin Mohamed Waheed Elbeih ; Supervision Prof. Dr. Hesham Maged Osman.
Material type:
- text
- Unmediated
- volume
- إستخدام منهجيات قياس فقدان الإنتاجية فى مطالبات التشييد فى مصر [Added title page title]
- 624.1
- Issues also as CD.
Item type | Current library | Home library | Call number | Status | Barcode | |
---|---|---|---|---|---|---|
![]() |
قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2023.Wa.U (Browse shelf(Opens below)) | Not for loan | 01010110090779000 |
Browsing المكتبة المركزبة الجديدة - جامعة القاهرة shelves Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
Cai01.13.05.M.Sc.2023.Sh.F A fuzzy expert system to calculate the optimum cost of quality using risk based thinking in construction projects / | Cai01.13.05.M.Sc.2023.Sh.N Numerical Simulation Of Dynamic Compaction In Dry Sand Using Different Constitutive Models / | Cai01.13.05.M.Sc.2023.Ta.N A novel material to enhance concrete permeability / | Cai01.13.05.M.Sc.2023.Wa.U The use of productivity loss quantification methodologies for construction claims in Egypt / | Cai01.13.05.M.Sc.2023.Ya.M A Modified Genetic Algorithm-Heuristic Programming Model For Optimal Design Of Sewer Networks / | Cai01.13.05.M.Sc.2024.Ab.P Preliminary Sizing of Dipping Tube Hydropneumatic Tank on Pumping Mains / | Cai01.13.05.M.Sc.2024.Ah.B Behavior of reinforced concrete beams subjected to indirect loads / |
Thesis (M.Sc)-Cairo University, 2023.
Bibliography: pages 100-103.
Labor productivity is considered from key success factors for achieving project on time and within budget. Construction projects are featured by the inherent nature of changes that could occur at any phase of the project. The severe impact of changes is during the execution of the construction phase of projects leading to delay, disruption and cost overrun, and hence, causing cost overrun and financial loss for contractual parties. Proving and quantifying lost labor productivity due to changes is considered one of the most controversial areas in the field of construction claims and disputes. The carried-out research aimed at investigating the level of awareness, frequency of usage, and success rate of each of the disruption analysis quantification methodologies. In addition to, factors affecting their selection and reasons behind not fulfilling disruption claim in Egypt. Finally, A Web-Based expert system was developed based on four factors to facilitate the determination of the most appropriate productivity loss quantification analysis methodology, ensuring successful cost compensation claims and reducing chances for disputes between contractual parties
تعتبر إنتاجية العمالة احد مقاييس النجاح الرئيسية لتنقيذ المشروع طبقا للوقت المحدد والميزانية المحددة. تتصف مشروعات التشييد بالطبيعة المتأصلة للتغييرات التي يمكن أن تحدث في أي مرحلة من مراحل المشروع. حيث أوج تأثير التغييرات هو أثناء تنفيذ مرحلة التشييد مما يؤدي إلى التأخير وتجاوز التكلفة والخسارة المالية للأطراف محل التعاقد. إن إثبات وقياس فقدان إنتاجية العمالة بسبب التغييرات من أكثر المجالات إثارة للنزاع في مجال دعاوى ومنازعات التشييد. إن هدف البحث هو التحقق من مستوى الوعي، وتكرار استخدام، ومعدل نجاح منهجيات التحليل الكمي لتحليل فقدان الانتناجية. بالإضافة إلى العوامل المؤثرة في اختيارهم والأسباب الكامنة وراء عدم تلبية مطالبة فقدان الانتناجية في مصر. وأخيرا تم تطوير نظام خبير قائم على الويب استنادًا إلى أربعة معايير مما يضمن النجاح مطالبات تعويض التكلفة و تقليل فرص النزاعات بين أطراف التعاقد.
Issues also as CD.
Text in English and abstract in Arabic & English.