header
Local cover image
Local cover image
Image from OpenLibrary

An Integrated Quality Assurance Model For Information Systems Projects Management / Nagy Ramadan Darwish Omran ; Supervised Mokhtar Boshra Riad , Sherif Abd El mageed Mazen

By: Contributor(s): Language: Eng Publication details: Cairo : Nagy Ramadan Darwish Omran , 2005Description: 229P : ill ; 30cmOther title:
  • نموذج متكامل لتأكيد الجودة لادارة مشروعات نظم المعلومات [Added title page title]
Subject(s): Online resources: Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (PH.D.) - Cairo University - Faculty Of Computers and Information - Department Of Information Systems Summary: Project Management (PM) is very crucial for the success of Information System (IS) projects PM must be done for all types or sizes of IS projects The mismanaged projects may lead to unfulfilled requirements , uncontrolled change of project scope , uncontrolled change of technology , unexpected risks of the project , uncontrolled subcontracting and integration , cost overruns , and / or late delivery
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Status Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.20.04.Ph.D.2005.Na.I. (Browse shelf(Opens below)) Not for loan 01010110044590000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.20.04.Ph.D.2005.Na.I. (Browse shelf(Opens below)) Not for loan 01020110044590000

Thesis (PH.D.) - Cairo University - Faculty Of Computers and Information - Department Of Information Systems

Project Management (PM) is very crucial for the success of Information System (IS) projects PM must be done for all types or sizes of IS projects The mismanaged projects may lead to unfulfilled requirements , uncontrolled change of project scope , uncontrolled change of technology , unexpected risks of the project , uncontrolled subcontracting and integration , cost overruns , and / or late delivery

Issued also as CD

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image