header
Local cover image
Local cover image
Image from OpenLibrary

Construction schedual delay assessment in joint venture projects : A fuzzy logic method / Mohammed Abdulrahman Mohammed Abdulgawad ; Supervised Moheeb Elsaid Ibrahim , Maged Ezzat Georgy

By: Contributor(s): Language: Eng Publication details: Cairo : Mohammed Abdulrahman Mohammed Abdulgawad , 2005Description: 201P : ill ; 30cmOther title:
  • تأخير مشروعات التشييد للشركات التضامنية : نظام للتقييم باستخدام المنطق الضبابى [Added title page title]
Subject(s): Online resources: Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty Of Engineering - Department Of Civil Engineering Summary: The evolving tendency towards globalizatiopn has brought about new forms for business cooperation , one of which is joint ventures
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Status Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2005.Mo.C (Browse shelf(Opens below)) Not for loan 01010110044893000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2005.Mo.C (Browse shelf(Opens below)) Not for loan 01020110044893000

Thesis (M.Sc.) - Cairo University - Faculty Of Engineering - Department Of Civil Engineering

The evolving tendency towards globalizatiopn has brought about new forms for business cooperation , one of which is joint ventures

Issued also as CD

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image