Studying a cracked embankment having soft clay formation and base / Abeer Abdelmoaty Hassan Heikal ; Supervised Hisham Hussin Hafez , Hany Abdellatif Lotfy , Amira Mmohamed Abdelrahman
Language: Eng Publication details: Cairo : Abeer Abdelmoaty Hassan Heikal , 2006Description: 256 P : charts ; 30cmSubject(s): Available additional physical forms:- Issued also as CD
Item type | Current library | Home library | Call number | Copy number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|---|
Thesis | قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2006.Ab.S (Browse shelf(Opens below)) | Not for loan | 01010110045538000 | |||
CD - Rom | مخـــزن الرســائل الجـــامعية - البدروم | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2006.Ab.S (Browse shelf(Opens below)) | 45538.CD | Not for loan | 01020110045538000 |
Browsing المكتبة المركزبة الجديدة - جامعة القاهرة shelves Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
Cai01.13.05.M.Sc.2005.Zi.R. Rectification of Ikonos Satellite Image and Toposys Lidar Image / | Cai01.13.05.M.Sc.2006.Ab.S. Structural design of radioactive waste concrete disposal vaults / | Cai01.13.05.M.Sc.2006.Ab.S. Structural design of radioactive waste concrete disposal vaults / | Cai01.13.05.M.Sc.2006.Ab.S Studying a cracked embankment having soft clay formation and base / | Cai01.13.05.M.Sc.2006.Ab.S Studying a cracked embankment having soft clay formation and base / | Cai01.13.05.M.Sc.2006.Ah.C Computer aided design of steel telecommunication towers / | Cai01.13.05.M.Sc.2006.Ah.C Computer aided design of steel telecommunication towers / |
Thesis (M.Sc.) - Cairo University - Faculty Of Engineering - Department Of Civil Engineering
Recently a number of large - scale projects are being executed in North of EgyptAn example of these projects is El - Salam canal projectDuring construction , several problems would be facedOne of these problems is the passage of very heavy trucks above a newly constructed embankmentThe present research discusses this problemAn over load on a recently constructed part of the embankment of El - Salam Canal caused slope failureThis failure was accompanied with a crack noticed on the surface of the embankment
Issued also as CD
There are no comments on this title.