Development of computerized project controls management system (pcms) / Monir Abd El aziz Monir Moustafa ; Supervised Moheeb ELSaid Ibrahim , Mahmoud Abd El Salam Taha
Language: Eng Publication details: Cairo : Monir Abd El aziz Monir Moustafa , 2006Description: 248p : ill ; 30cmOther title:- تطوير نظام الى لادارة ومتابعة المشروعات [Added title page title]
- Issued also as CD
Item type | Current library | Home library | Call number | Status | Barcode | |
---|---|---|---|---|---|---|
![]() |
قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.Ph.D.2006.Mo.D. (Browse shelf(Opens below)) | Not for loan | 01010110045264000 | |
![]() |
مخـــزن الرســائل الجـــامعية - البدروم | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.Ph.D.2006.Mo.D. (Browse shelf(Opens below)) | Not for loan | 01020110045264000 |
Browsing المكتبة المركزبة الجديدة - جامعة القاهرة shelves Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
Cai01.13.05.Ph.D.2006.Ho.S. Seismic behavior of beam - column connection with different types of coated steel bars / | Cai01.13.05.Ph.D.2006.Ho.S. Seismic behavior of beam - column connection with different types of coated steel bars / | Cai01.13.05.Ph.D.2006.Mo.D. Development of computerized project controls management system (pcms) / | Cai01.13.05.Ph.D.2006.Mo.D. Development of computerized project controls management system (pcms) / | Cai01.13.05.Ph.D.2006.Re.R. Rational model for the permeability of satuarated soil / | Cai01.13.05.Ph.D.2006.Re.R. Rational model for the permeability of satuarated soil / | Cai01.13.05.Ph.D.2006.Sh.R. Reliability of reinforced concrete circular and rectangular short columns strengthened with cfrp laminates under concentric and eccentric loads / |
Thesis (PH.D.) - Cairo University - Faculty Of Engineering - Department Of Civil Engineering
Pulling essential Cost , Schedule , and technical information together in a meaningful , coherent fashion is always a challenge facing the project management teamIf this can not be done , management information will be fragmented , will not contribute effectively to project management , and may actually mislead the management by presenting a distorted view of the project status [Fundamentals of Project Performance Measurement - Robert RKemps]
Issued also as CD
There are no comments on this title.