header
Local cover image
Local cover image
Image from OpenLibrary

Rehabilitation of failed slopes by piles / Haytham Hamed Megahed Elsokary ; Supervised Ahmed Hisham Dakhly , Hisham Arafat Mahdi

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Haytham Hamed Megahed Elsokary , 2012Description: 228P. : charts , facsimiles ; 30cmOther title:
  • تدعيم الميول المنهارة بإستخدام الخوازيق [Added title page title]
Subject(s): Online resources: Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering Summary: The main aim of this research is to investigate the rehabilitation of failed slopes by various pile systems . In Egypt , several highway slope failures occurred in recent years such as the Naga - Hammadi highway ( 2007 ) Esna - Luxor highway ( 2008 ) and Kafr - Shokr - Aga highway ( 2011 ) attributed to the widening of highways towards the slope of the water canals to avoid land acquisition process as well as the excavation at the toe of the slopes during the process of maintaining the canals and the sudden drawdown of the water level in the canals
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2012.Ha.R (Browse shelf(Opens below)) Not for loan 01010110058504000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2012.Ha.R (Browse shelf(Opens below)) 58504.CD Not for loan 01020110058504000

Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering

The main aim of this research is to investigate the rehabilitation of failed slopes by various pile systems . In Egypt , several highway slope failures occurred in recent years such as the Naga - Hammadi highway ( 2007 ) Esna - Luxor highway ( 2008 ) and Kafr - Shokr - Aga highway ( 2011 ) attributed to the widening of highways towards the slope of the water canals to avoid land acquisition process as well as the excavation at the toe of the slopes during the process of maintaining the canals and the sudden drawdown of the water level in the canals

Issued also as CD

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image