Performance analysis of beam pumping systems / Mohamed Esmat Abdelsamee Husin ; Supervised Fouad Khalaf , Abdelalim Hashem , Abdelwaly Abdallah
Material type:
- تحليل أداء نظم الرفع الصناعى الترددى [Added title page title]
- Issued also as CD
Item type | Current library | Home library | Call number | Copy number | Status | Barcode | |
---|---|---|---|---|---|---|---|
![]() |
قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.12.M.Sc.2013.Mo.P (Browse shelf(Opens below)) | Not for loan | 01010110060915000 | ||
![]() |
مخـــزن الرســائل الجـــامعية - البدروم | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.12.M.Sc.2013.Mo.P (Browse shelf(Opens below)) | 60915.CD | Not for loan | 01020110060915000 |
Browsing المكتبة المركزبة الجديدة - جامعة القاهرة shelves Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
Cai01.13.12.M.Sc.2013.Mo.E Effect of Capillary Pressure on the Numerical Simulation of Fractured and Non-Fractured Reservoirs / | Cai01.13.12.M.Sc.2013.Mo.N New proposed techniques for optimum pit limit heuristic algorithms and software development / | Cai01.13.12.M.Sc.2013.Mo.N New proposed techniques for optimum pit limit heuristic algorithms and software development / | Cai01.13.12.M.Sc.2013.Mo.P Performance analysis of beam pumping systems / | Cai01.13.12.M.Sc.2013.Mo.P Performance analysis of beam pumping systems / | Cai01.13.12.M.Sc.2013.Ne.U Upgrading of oil shale by flotation / | Cai01.13.12.M.Sc.2013.Ne.U Upgrading of oil shale by flotation / |
Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Metallurgical Engineering
The aim of study was to analyze beam pumping system problems encountered in Agiba Company during last ten years ending with modified design rules that were learnt . Total failure frequency dropped from 4 to 2.25 failures / well / year. Atotal system down time improvement of 43% together with production losses saving of 44% was achieved. A simple friendly expert system was developed and validated to diagnose and troubleshoot system problems
Issued also as CD
There are no comments on this title.