header
Image from OpenLibrary

Causes of schedule delays in politically unstable areas and developing countries / Mohamed Ossama Yehia Kadry ; Supervised Maged Ezzat Georgy , Hesham Maged Osman

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Mohamed Ossama Yehia Kadry , 2013Description: 100 , (100) P. : charts ; 30cmOther title:
  • اسباب تأخير المشروعات فى الدول النامية والغير مستقرة سياسيا [Added title page title]
Subject(s): Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Engineering- Department of Civil Engineering Summary: Recent statistics indicate that construction companies are growing their business outside their home market. A significant portion of this growth is in developing countries and politically unstable areas. with the aim to help Egyptian contractors expand their business internationally, this thesis investigates the causes of schedule delay in politically unstable and/ or economically developing countries
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Date due Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2013.Mo.C (Browse shelf(Opens below)) Not for loan 01010110062270000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2013.Mo.C (Browse shelf(Opens below)) 62270.CD Not for loan 01020110062270000

Thesis (M.Sc.) - Cairo University - Faculty of Engineering- Department of Civil Engineering

Recent statistics indicate that construction companies are growing their business outside their home market. A significant portion of this growth is in developing countries and politically unstable areas. with the aim to help Egyptian contractors expand their business internationally, this thesis investigates the causes of schedule delay in politically unstable and/ or economically developing countries

Issued also as CD

There are no comments on this title.

to post a comment.