Developing of a computer-based model for applying the price adjustment formula in construction projects in Egypt / Mohamed Magdy Abdallah Elzbdany ; Supervised Moheeb Elsaid Ibrahim , Ahmed Mohamed Eldokhmasey
Material type:
- تطوير نموذج حاسوبي لتطبيق معادلة تغيير الأسعار في مشروعات التشييد في جمهورية مصر العربية [Added title page title]
- Issued also as CD
Item type | Current library | Home library | Call number | Copy number | Status | Barcode | |
---|---|---|---|---|---|---|---|
![]() |
قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2015.Mo.D (Browse shelf(Opens below)) | Not for loan | 01010110068494000 | ||
![]() |
مخـــزن الرســائل الجـــامعية - البدروم | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2015.Mo.D (Browse shelf(Opens below)) | 68494.CD | Not for loan | 01020110068494000 |
Browsing المكتبة المركزبة الجديدة - جامعة القاهرة shelves Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
Cai01.13.05.M.Sc.2015.Mo.D Dynamic simulation of municipal-industrial wastewater treatment using the ASM3 model / | Cai01.13.05.M.Sc.2015.Mo.D Dynamic simulation of municipal-industrial wastewater treatment using the ASM3 model / | Cai01.13.05.M.Sc.2015.Mo.D Developing of a computer-based model for applying the price adjustment formula in construction projects in Egypt / | Cai01.13.05.M.Sc.2015.Mo.D Developing of a computer-based model for applying the price adjustment formula in construction projects in Egypt / | Cai01.13.05.M.Sc.2015.Mo.D Design requirements of lateral bracing of I Beams / | Cai01.13.05.M.Sc.2015.Mo.D Design requirements of lateral bracing of I Beams / | Cai01.13.05.M.Sc.2015.Mo.E The effect of using nano materials on the properties of cement paste and mortar / |
Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
Volatile price of the projects items throughout the implementation phase is considered a major problem facing construction projects all over the world. Such problem arises so often and leads in most cases to arising claims. Prices variation can arise due to various economic, political and natural reasons. Inflation is considered the most obvious phenomena in the case of price variation; therefore, the biggest problem is the volatility of prices throughout the work course whose impact is required to be avoided during the implementation phase. The research also addresses the means of dealing with the price variation according to the different types of general terms and conditions of the international contracts. The research presents the definition of computer models and its various applications in construction. The research introduces a computer-based model titled as CP_PAS designed specially to adjust the price of contract. The introduced system is general and can be used by all parties of projects to estimate the adjustment of prices, as it is considered an instrument to provide the contract with flexibility to adapt the market price changes and upon agreement between parties as per the pre-determined terms and conditions
Issued also as CD
There are no comments on this title.