header
Image from OpenLibrary

CPM delay analysis methodologies in the Egyptian construction market / Mohamed Magdy Ahmed Mohamed ; Supervised Moheeb Elsaid Ibrahim , Maged Ezzat Georgy , Hesham Maged Osman

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Mohamed Magdy Ahmed Mohamed , 2016Description: 147 P. : charts ; 30cmOther title:
  • طرق تحليل التاخير بطريقة النظام الحرج فى سوق التشييد المصرى [Added title page title]
Subject(s): Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering Summary: Delays in construction became common, forcing contractors to accept tighter schedules, together with slimmer contingency. Accordingly, the consequence is claims, disputes and arbitration. Thus, understanding how practitioners would utilize a certain DAM over another, the level of awareness, frequency of usage, complexity and success rate of each CPM DAM used by different groups in the construction market, thus, becomes essential. By means of a triangulation approach a Quantitative Questionnaire and a Qualitative Interview, and, following an analysis aided SPSS, the above was contested
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Date due Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2016.Mo.C (Browse shelf(Opens below)) Not for loan 01010110069753000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2016.Mo.C (Browse shelf(Opens below)) 69753.CD Not for loan 01020110069753000

Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering

Delays in construction became common, forcing contractors to accept tighter schedules, together with slimmer contingency. Accordingly, the consequence is claims, disputes and arbitration. Thus, understanding how practitioners would utilize a certain DAM over another, the level of awareness, frequency of usage, complexity and success rate of each CPM DAM used by different groups in the construction market, thus, becomes essential. By means of a triangulation approach a Quantitative Questionnaire and a Qualitative Interview, and, following an analysis aided SPSS, the above was contested

Issued also as CD

There are no comments on this title.

to post a comment.