Contractors{u2019} evaluation method during prequalification stage in construction projects in Egypt / Asmaa Ragab Salama Farag ; Supervised Moheeb Elsaid Ibrahim , Ahmed Mohamed Eldokhmasey
Material type:
- طريقة تقييم المقاولين خلال مرحلة سبق التأهيل فى المشروعات الأنشائية فى مصر [Added title page title]
- Issued also as CD
Item type | Current library | Home library | Call number | Copy number | Status | Barcode | |
---|---|---|---|---|---|---|---|
![]() |
قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2016.As.C (Browse shelf(Opens below)) | Not for loan | 01010110070764000 | ||
![]() |
مخـــزن الرســائل الجـــامعية - البدروم | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2016.As.C (Browse shelf(Opens below)) | 70764.CD | Not for loan | 01020110070764000 |
Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
The main objective in this research is to develop a framework for the method of evaluating the construction prequalification. It is aimed to depict the most important criteria that affect the performance of the contractor through the life cycle of projects in Egypt and have to be considered by owners during preparation of the Pre-Qualification form (PQF). The used methodology depends on proposing a new questionnaire survey that been formed, based on the previous efforts in this field, for the most important criteria of the prequalification process. In addition, a computer model called 2EMCC-PS3 was developed to evaluate the proposed contractors in a quantitive manner taking into consideration the owner{u2019}s (or consultants) judgment upon the requirements of each project with incorporating the weights of prequalification criteria as extracted from the proposed questionnaire
Issued also as CD
There are no comments on this title.