Risk assessment of hidden failures in electrical power systems / Medhat Elsayed Gabr Mostafa ; Supervised Elsayed Mohamed Ahmed Tageldin , Mostafa Ahmed Elshahed
Material type: TextLanguage: English Publication details: Cairo : Medhat Elsayed Gabr Mostafa , 2017Description: 113 P. : facsimiles ; 30cmOther title:- تقدير مخاطر الأعطال المستترة فى شبكات القوى الكهربائية [Added title page title]
- Issued also as CD
Item type | Current library | Home library | Call number | Copy number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|---|
Thesis | قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.07.M.Sc.2017.Me.R (Browse shelf(Opens below)) | Not for loan | 01010110074460000 | |||
CD - Rom | مخـــزن الرســائل الجـــامعية - البدروم | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.07.M.Sc.2017.Me.R (Browse shelf(Opens below)) | 74460.CD | Not for loan | 01020110074460000 |
Browsing المكتبة المركزبة الجديدة - جامعة القاهرة shelves Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
Cai01.13.07.M.Sc.2017.Ma.O Optimization of real power loss and voltage stability index of distribution systems with distributed generation / | Cai01.13.07.M.Sc.2017.Ma.T A travelling waves-based fault location scheme for multi-tapped overhead distribution systems / | Cai01.13.07.M.Sc.2017.Ma.T A travelling waves-based fault location scheme for multi-tapped overhead distribution systems / | Cai01.13.07.M.Sc.2017.Me.R Risk assessment of hidden failures in electrical power systems / | Cai01.13.07.M.Sc.2017.Me.R Risk assessment of hidden failures in electrical power systems / | Cai01.13.07.M.Sc.2017.Mo.D Design and implementation of grid-connected PV system / | Cai01.13.07.M.Sc.2017.Mo.D Design and implementation of grid-connected PV system / |
Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Electrical Power and Machines
This study depends on the risk assessment process that is being described by expected probabilistic approach; this approach will be applied as the proactive step to investigate the hidden failure in power system. The correlation between the risk assessment and hidden failure has been proved as an effective tool to predict the hidden failure. The systemic definition of hidden failure has been suggested to match with the correlation between both and include all partial systems of the whole power system. This has been proved by examples and case study
Issued also as CD
There are no comments on this title.