header
Local cover image
Local cover image
Image from OpenLibrary

The assessment of data mining techniques in analyzing construction project delays using risk management tools / Ahmed Wael Mohamed Khairy Ali Gondia ; Supervised Ayman Hamdy Nassar

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Ahmed Wael Mohamed Khairy Ali Gondia , 2017Description: 185 Leaves : charts , facsimiles ; 30cmOnline resources: Dissertation note: Thesis (M.Sc.) - German University - Faculty of Postgraduate Studies and Scientific Research - Department of Civil Engineering Summary: Construction project are perceived to be inherently risky due to their complex and multidisciplinary nature. In spite of the widespread adoption of delay analysis methodologies and risk management protocols by many organizations, time delay is inevitably associated with almost all construction projects
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Status Barcode
Thesis Thesis قاعة الثقاقات الاجنبية - الدور الثالث المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.34.M.Sc.2017.Ah.A (Browse shelf(Opens below)) Not for loan 01010110075393000
Browsing المكتبة المركزبة الجديدة - جامعة القاهرة shelves Close shelf browser (Hides shelf browser)
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
Cai01.34.M.Sc.2016.نه.د دور العوامل الداخلية والخارجية فى إعادة بناء الحدود الدولية = The role of domestic and foreign factors international dynamics of boundary drawing : دراسة حالة دولة جنوب السودان = South Sudan AS a case study/ Cai01.34.M.Sc.2016.ول.و الوثائق و السجلات العربية لديوان القناطر الخيرية فى الفترة من ١٢٦٢-١٣٠٢هـ/١٨٤٥-١٨٨٤م: دراسة أرشيفية وثائقية / Cai01.34.M.Sc.2017.Ab.P Positioning of drug carriers using permenent magnet-based robotic system / Cai01.34.M.Sc.2017.Ah.A The assessment of data mining techniques in analyzing construction project delays using risk management tools / Cai01.34.M.Sc.2017.Ah.C Comprison between pushover analysis techniaques and validation of the simplified model pushover analysis / Cai01.34.M.Sc.2017.Ah.C Comparison between seismic performmance of multistory RC frame buildings designed using the Egyptian codes of practice and the eurocodes / Cai01.34.M.Sc.2017.Ah.E Evaluation of æ kernel- based Real-time embedded linux for an LTE/WCDAM base station /

Thesis (M.Sc.) - German University - Faculty of Postgraduate Studies and Scientific Research - Department of Civil Engineering

Construction project are perceived to be inherently risky due to their complex and multidisciplinary nature. In spite of the widespread adoption of delay analysis methodologies and risk management protocols by many organizations, time delay is inevitably associated with almost all construction projects

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image