header
Image from OpenLibrary

Measuring construction performance in public private partnership projects / Emad Fayez Gaid Abdelsaid ; Supervised Mohamed Mahdy Marzouk

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Emad Fayez Gaid Abdelsaid , 2018Description: 130 P. : charts ; 30cmOther title:
  • قياس مستوى أداء مشروعات شراكة القطاع العام والخاص [Added title page title]
Subject(s): Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (Ph.D.) - Cairo University - Faculty of Engineering - Department of Civil Engineering Summary: PPP projects has different phases and stakeholders needed to measure and assess the level of success and achievements of their targets. Performance measurement is a crucial component of business management. It is necessary to have a well-designed measurement system has the ability to check and monitor the performance and support the long-term strategic decisions for the company. key performance indicators (KPIs) present one of the best methods to measure and improve performance evaluation. The main target of this research to identify and prioritize KPIs that measure and evaluate PPP projects and contractors{u2019} performance in Egypt taking into consideration the size of the organization and the type of the project. Exploratory Factor Analysis (EFA) method has been used to analyze and determines the interrelationships between the set of indicators. the research introduces set of mathematical models to measure the overall project performance. Two prediction models are created to predict the cost at completion of the construction project
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Date due Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.Ph.D.2018.Em.M (Browse shelf(Opens below)) Not for loan 01010110078452000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.Ph.D.2018.Em.M (Browse shelf(Opens below)) 78452.CD Not for loan 01020110078452000

Thesis (Ph.D.) - Cairo University - Faculty of Engineering - Department of Civil Engineering

PPP projects has different phases and stakeholders needed to measure and assess the level of success and achievements of their targets. Performance measurement is a crucial component of business management. It is necessary to have a well-designed measurement system has the ability to check and monitor the performance and support the long-term strategic decisions for the company. key performance indicators (KPIs) present one of the best methods to measure and improve performance evaluation. The main target of this research to identify and prioritize KPIs that measure and evaluate PPP projects and contractors{u2019} performance in Egypt taking into consideration the size of the organization and the type of the project. Exploratory Factor Analysis (EFA) method has been used to analyze and determines the interrelationships between the set of indicators. the research introduces set of mathematical models to measure the overall project performance. Two prediction models are created to predict the cost at completion of the construction project

Issued also as CD

There are no comments on this title.

to post a comment.