Measuring construction performance in public private partnership projects / Emad Fayez Gaid Abdelsaid ; Supervised Mohamed Mahdy Marzouk
Material type: TextLanguage: English Publication details: Cairo : Emad Fayez Gaid Abdelsaid , 2018Description: 130 P. : charts ; 30cmOther title:- قياس مستوى أداء مشروعات شراكة القطاع العام والخاص [Added title page title]
- Issued also as CD
Item type | Current library | Home library | Call number | Copy number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|---|
Thesis | قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.Ph.D.2018.Em.M (Browse shelf(Opens below)) | Not for loan | 01010110078452000 | |||
CD - Rom | مخـــزن الرســائل الجـــامعية - البدروم | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.Ph.D.2018.Em.M (Browse shelf(Opens below)) | 78452.CD | Not for loan | 01020110078452000 |
Browsing المكتبة المركزبة الجديدة - جامعة القاهرة shelves Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
Cai01.13.05.Ph.D.2018.Ba.S Structural behavior of cold-formed-steel shearwalls sheathed with ferro-cement boards / | Cai01.13.05.Ph.D.2018.Ba.S Structural behavior of cold-formed-steel shearwalls sheathed with ferro-cement boards / | Cai01.13.05.Ph.D.2018.Em.M Measuring construction performance in public private partnership projects / | Cai01.13.05.Ph.D.2018.Em.M Measuring construction performance in public private partnership projects / | Cai01.13.05.Ph.D.2018.Ha.I Integrated model for measurement, evaluation and forecasting the performance of construction projects / | Cai01.13.05.Ph.D.2018.Ha.I Integrated model for measurement, evaluation and forecasting the performance of construction projects / | Cai01.13.05.Ph.D.2018.Ma.D Developing an integrated risk management system for evaluating ppps projects in LIBYA / |
Thesis (Ph.D.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
PPP projects has different phases and stakeholders needed to measure and assess the level of success and achievements of their targets. Performance measurement is a crucial component of business management. It is necessary to have a well-designed measurement system has the ability to check and monitor the performance and support the long-term strategic decisions for the company. key performance indicators (KPIs) present one of the best methods to measure and improve performance evaluation. The main target of this research to identify and prioritize KPIs that measure and evaluate PPP projects and contractors{u2019} performance in Egypt taking into consideration the size of the organization and the type of the project. Exploratory Factor Analysis (EFA) method has been used to analyze and determines the interrelationships between the set of indicators. the research introduces set of mathematical models to measure the overall project performance. Two prediction models are created to predict the cost at completion of the construction project
Issued also as CD
There are no comments on this title.