header
Local cover image
Local cover image
Image from OpenLibrary

A comparison of performance of residual control charts for some parametric and nonparametric regression models / Engy Saeed Mohamed Ahmed ; Supervised Sayed Mesheal Elsayed , Salah Mahdy Mohamed , Shereen Hamdy Abdellatif

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Engy Saeed Mohamed Ahmed , 2019Description: 137 Leaves ; 30cmOther title:
  • مقارنة أداء خرائط ضبط البواقى لبعض نماذج الانحدار المعلمية و اللامعلمية [Added title page title]
Subject(s): Online resources: Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Graduate Studies for Statistical Research - Department of Statistics and Econometrics Summary: The most important use of a control chart is to improve the performance by identify assignable causes. If these causes can be eliminated from the process, variability will be reduced and the process will be improved, focused on the statistical technique using the regression analysis in constructing regression residual control chart. Regression analysis is one of the most commonly statistical techniques used for analyzing data, describing the relation between the response variable and the explanatory variables. Parametric regression is assume a pre-specified form of the regression function. One of the most common parametric estimation methods is maximum likelihood estimation that is used in analysis for fitting the models. On the other side, the nonparametric regression models do not assume a pre-specified form of the regression function, and one of the nonparametric estimation method which used in analysis is the spline smoothing. The design of control charts is performed through two phase{u2019}s analysis. In phase I analysis, the stable control chart for regression residual will be suggested for monitoring by using X-bar /S-charts. In phase II analysis, the monitoring done by using EWMA control charts. A simulation study has been conducted to compare between the performance of deviance residuals, and Pearson residuals in case of parametric regression estimation and nonparametric regression estimation through EWMA control charts. Applications have been done using R program version 3.5.2 for fitting a gamma model with two different link functions; identity link function and log link function and extracting two different types of residuals; deviance residuals and pearson residuals, then the average run length measure has been calculated to evaluate the performance of residual control charts
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.18.04.M.Sc.2019.En.C (Browse shelf(Opens below)) Not for loan 01010110079939000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.18.04.M.Sc.2019.En.C (Browse shelf(Opens below)) 79939.CD Not for loan 01020110079939000

Thesis (M.Sc.) - Cairo University - Faculty of Graduate Studies for Statistical Research - Department of Statistics and Econometrics

The most important use of a control chart is to improve the performance by identify assignable causes. If these causes can be eliminated from the process, variability will be reduced and the process will be improved, focused on the statistical technique using the regression analysis in constructing regression residual control chart. Regression analysis is one of the most commonly statistical techniques used for analyzing data, describing the relation between the response variable and the explanatory variables. Parametric regression is assume a pre-specified form of the regression function. One of the most common parametric estimation methods is maximum likelihood estimation that is used in analysis for fitting the models. On the other side, the nonparametric regression models do not assume a pre-specified form of the regression function, and one of the nonparametric estimation method which used in analysis is the spline smoothing. The design of control charts is performed through two phase{u2019}s analysis. In phase I analysis, the stable control chart for regression residual will be suggested for monitoring by using X-bar /S-charts. In phase II analysis, the monitoring done by using EWMA control charts. A simulation study has been conducted to compare between the performance of deviance residuals, and Pearson residuals in case of parametric regression estimation and nonparametric regression estimation through EWMA control charts. Applications have been done using R program version 3.5.2 for fitting a gamma model with two different link functions; identity link function and log link function and extracting two different types of residuals; deviance residuals and pearson residuals, then the average run length measure has been calculated to evaluate the performance of residual control charts

Issued also as CD

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image