A web-based application to measure the integrated project delivery and Associated risk reduction in Construction projects in egypt / Mohamed Elsayed Mohamed Moustafa Younis ; Supervised Moheeb Elsaid Ibrahim , Ahmed Mohamed Eldokhmasey

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Mohamed Elsayed Mohamed Mostafa Younis , 2020Description: 177 , (50) P. : charts ; 25cmOther title:
  • تطبيق شبكى لقياس درجة النظام التكاملى لتسليم المشروعات وعلاقته بتقليل المخاطر فى مشروعات التشييد فى مصر [Added title page title]
Subject(s): Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (Ph.D.) - Cairo University - Faculty of Engineering - Department of Civil Engineering Summary: This research investigated Integrated Project Delivery system IPD and its twelve key principles. A list of eight risk groups consisting of 57 individual risks was developed to measure the effect of using IPD on risk reduction. Under assumption of applying the IPD, the statistical analysis revealed significant anticipated risk reduction was noted for 2Design3 and 2Management3 risks, moderate reduction was recorded for 2Construction3 and 2Contractual3 risk groups, while slight reduction was found for the 2Economic3 and 2Political3 risk groups. A web-based application system was developed named 2IPD- Risk Assessor3 to be as a tool measuring the degree of integration of any construction project based on its contractual terms and conditions. It can calculate the anticipated risk reduction of any construction project. It can calculate the monetary values of construction risks allowances to be used in budget purposes and cost of lost opportunity corresponding to missing integration level of the project
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Date due Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.Ph.D.2020.Mo.W (Browse shelf(Opens below)) Not for loan 01010110081660000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.Ph.D.2020.Mo.W (Browse shelf(Opens below)) 81660.CD Not for loan 01020110081660000

Thesis (Ph.D.) - Cairo University - Faculty of Engineering - Department of Civil Engineering

This research investigated Integrated Project Delivery system IPD and its twelve key principles. A list of eight risk groups consisting of 57 individual risks was developed to measure the effect of using IPD on risk reduction. Under assumption of applying the IPD, the statistical analysis revealed significant anticipated risk reduction was noted for 2Design3 and 2Management3 risks, moderate reduction was recorded for 2Construction3 and 2Contractual3 risk groups, while slight reduction was found for the 2Economic3 and 2Political3 risk groups. A web-based application system was developed named 2IPD- Risk Assessor3 to be as a tool measuring the degree of integration of any construction project based on its contractual terms and conditions. It can calculate the anticipated risk reduction of any construction project. It can calculate the monetary values of construction risks allowances to be used in budget purposes and cost of lost opportunity corresponding to missing integration level of the project

Issued also as CD