header
Image from OpenLibrary

Investigating design codes criteria for post tensioned concrete slabs / Ahmed Magdy Abdelmonem Baraka ; Supervised Hany Ahmed Abdalla

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Ahmed Magdy Abdelmonem Baraka , 2021Description: 86 P. : charts , facsimiles ; 25cmOther title:
  • إستقصاء معايير أكواد التصميم الخاصة بالبلاطات الخرسانية ذات الشد اللاحق [Added title page title]
Subject(s): Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering Summary: Numerical model for post tensioned slab using the finite elements programs (RAM), (ADAPT) and nonlinear finite element program (ANSYS v19) and its verification with experimental counterpart will be presented. Linear and non-linear analysis for reinforced concrete elements can be obtained by (RAM), (ADAPT) programs and ANSYS software.This is a study of both ACI code [19] and BS code [21] in design post tension slab system by using of Ram program and Adapt program. Making two models of slab having three spans ranging between (9-10-9)m for model 1 and (9-5-9)m for model 2 to save a code requirements as columns distribution , columns dimension and opening requirements. And then design slab model by using ACI code [19] and BS code [19] by using Ram program and Adapt program. The ECP 203-2018 code [23] is not clear when it comes to designing post tensioned concrete slabs in terms of the requirements to be followed, the permissible limits and also the design method. So some conditions and equations will be proposed that help in designing post-tensioned concrete slabs by using the ECP 203-2018 code [23]. A cost benefit analysis may be a procedure by which organizations can analyze results, techniques or projects, or determine a worth for intangibles. Making a model having area equal 2755 m2. Using model to affirm that using P.T system saving 10% to 20% of total cost and can increase. Solving model by using (Ram) program. Writing a simple computer program to design uncomplicated post-tensioned floor systems taking into consideration the recommendations of the ACI code [19] and BS code [21]
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2021.Ah.I (Browse shelf(Opens below)) Not for loan 01010110084093000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2021.Ah.I (Browse shelf(Opens below)) 84093.CD Not for loan 01020110084093000

Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering

Numerical model for post tensioned slab using the finite elements programs (RAM), (ADAPT) and nonlinear finite element program (ANSYS v19) and its verification with experimental counterpart will be presented. Linear and non-linear analysis for reinforced concrete elements can be obtained by (RAM), (ADAPT) programs and ANSYS software.This is a study of both ACI code [19] and BS code [21] in design post tension slab system by using of Ram program and Adapt program. Making two models of slab having three spans ranging between (9-10-9)m for model 1 and (9-5-9)m for model 2 to save a code requirements as columns distribution , columns dimension and opening requirements. And then design slab model by using ACI code [19] and BS code [19] by using Ram program and Adapt program. The ECP 203-2018 code [23] is not clear when it comes to designing post tensioned concrete slabs in terms of the requirements to be followed, the permissible limits and also the design method. So some conditions and equations will be proposed that help in designing post-tensioned concrete slabs by using the ECP 203-2018 code [23]. A cost benefit analysis may be a procedure by which organizations can analyze results, techniques or projects, or determine a worth for intangibles. Making a model having area equal 2755 m2. Using model to affirm that using P.T system saving 10% to 20% of total cost and can increase. Solving model by using (Ram) program. Writing a simple computer program to design uncomplicated post-tensioned floor systems taking into consideration the recommendations of the ACI code [19] and BS code [21]

Issued also as CD

There are no comments on this title.

to post a comment.