Integrated information data base and cost control system for construction projects / Mahmoud Malek Olwan ; Supervised Moheeb ElSaid Ibrahim
Language: Eng Publication details: Cairo : Mahmoud Malek Olwan , 2004Description: 200p : ill ; 30cmOther title:- نظام متكامل لمعلوماتية قاعدة البيانات وضبط التكاليف لمشاريع التشييد [Added title page title]
- Issued also as CD
Item type | Current library | Home library | Call number | Status | Barcode | |
---|---|---|---|---|---|---|
![]() |
قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2004.Ma.I (Browse shelf(Opens below)) | Not for loan | 01010110043416000 | |
![]() |
مخـــزن الرســائل الجـــامعية - البدروم | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2004.Ma.I (Browse shelf(Opens below)) | Not for loan | 01020110043416000 |
Browsing المكتبة المركزبة الجديدة - جامعة القاهرة shelves Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
Cai01.13.05.M.Sc.2004.Ma.E Evaluation of local traffic control and operation strategies at signalized intersections / | Cai01.13.05.M.Sc.2004.Ma.F Feasibilit of Soil Aquifer Treatment Potential of Some Chemical Pollutans Within Wastewater / | Cai01.13.05.M.Sc.2004.Ma.F Feasibilit of Soil Aquifer Treatment Potential of Some Chemical Pollutans Within Wastewater / | Cai01.13.05.M.Sc.2004.Ma.I Integrated information data base and cost control system for construction projects / | Cai01.13.05.M.Sc.2004.Ma.I Integrated information data base and cost control system for construction projects / | Cai01.13.05.M.Sc.2004.Ma.W Water resources assessment in Siwa Oasis / | Cai01.13.05.M.Sc.2004.Ma.W Water resources assessment in Siwa Oasis / |
Thesis (M.Sc.) - Cairo University - Faculty Of Engineering - Department Of Civil Engineering
This work presents a cost control system which could be adapted to suit any construction companyThe proposed system is company oriented and it is capable of controlling various projects at the same timeThe developed system employs two basic functions , namely , establishing a data base for all the company resources , and cost controlling all its active projectsThe proposed system , which was implemented using Visual Basic , has the ability to generate up - to - date reports for both of the two referred functionsThus supporting the decision making and enhancing the cost estimation processes
Issued also as CD
There are no comments on this title.