A framework to improve performance based on the integration of risk management and lean six sigma: Case study / Mahmoud Yosry Ibrahim Ahmed ; Supervised Abdhadi Nabih Ahmed , Farouk Tamam Shoaib
Material type:
- إطار لتحسين الأداء إستنادا على التكامل بين إدارة المخاطر ولين ستة سيجما : دراسة حالة [Added title page title]
- Issued also as CD
Item type | Current library | Home library | Call number | Copy number | Status | Barcode | |
---|---|---|---|---|---|---|---|
![]() |
قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.18.06.Ph.D.2021.Ma.F (Browse shelf(Opens below)) | Not for loan | 01010110085202000 | ||
![]() |
مخـــزن الرســائل الجـــامعية - البدروم | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.18.06.Ph.D.2021.Ma.F (Browse shelf(Opens below)) | 85202.CD | Not for loan | 01020110085202000 |
Browsing المكتبة المركزبة الجديدة - جامعة القاهرة shelves Close shelf browser (Hides shelf browser)
Thesis (Ph.D.) - Cairo University - Faculty of Graduate Studies for Statistical Research - Department of tatistical Quality Control and Quality Assurance
This dissertation investigated the development, implementation, and evaluation of a Continuous improvement methodology founded to improve the performance of any organization. A case study in Fast Moving Consumer Goods "FMCG" organization, called "ABC Company," provided the opportunity to assess the effects of the proposed integration between risk management and lean six-sigma methodology on the productivity indicators (measured by cycle time, Overall Equipment Effectiveness, and defects rate).The Case study was conducted in three phases: Model and Concepts Design, Data Collection, and Analysis leading to findings. During the research, validity was pursued using triangulation and theory to help maintain the Case under research control. Observing the proposed methodology "integration between risk management and lean six sigma" in a real organization allowed the researcher to describe the merging process between Risk management and Six Sigma methodology and their relationships with each other. The proposed methodology allowed treating causes of failure while executing improvement projects that improve performance and provide opportunities for successful implementation. The results of the implementation of the proposed methodology in "ABC Company" showed a 35% improvement in the cycle time of Production Line, a 33.6 increase in the Overall Equipment Effectiveness, and a 64% decrease in the number of defects units as was expected by the end of the RDMAIC (Risk Management plan, Define, Measure, Analysis, Improve, Control) implementation
Issued also as CD
There are no comments on this title.