header
Local cover image
Local cover image
Image from OpenLibrary

A framework to improve performance based on the integration of risk management and lean six sigma: Case study / Mahmoud Yosry Ibrahim Ahmed ; Supervised Abdhadi Nabih Ahmed , Farouk Tamam Shoaib

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Mahmoud Yosry Ibrahim Ahmed , 2021Description: 145 Leaves : charts ; 30cmOther title:
  • إطار لتحسين الأداء إستنادا على التكامل بين إدارة المخاطر ولين ستة سيجما : دراسة حالة [Added title page title]
Subject(s): Online resources: Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (Ph.D.) - Cairo University - Faculty of Graduate Studies for Statistical Research - Department of tatistical Quality Control and Quality Assurance Summary: This dissertation investigated the development, implementation, and evaluation of a Continuous improvement methodology founded to improve the performance of any organization. A case study in Fast Moving Consumer Goods "FMCG" organization, called "ABC Company," provided the opportunity to assess the effects of the proposed integration between risk management and lean six-sigma methodology on the productivity indicators (measured by cycle time, Overall Equipment Effectiveness, and defects rate).The Case study was conducted in three phases: Model and Concepts Design, Data Collection, and Analysis leading to findings. During the research, validity was pursued using triangulation and theory to help maintain the Case under research control. Observing the proposed methodology "integration between risk management and lean six sigma" in a real organization allowed the researcher to describe the merging process between Risk management and Six Sigma methodology and their relationships with each other. The proposed methodology allowed treating causes of failure while executing improvement projects that improve performance and provide opportunities for successful implementation. The results of the implementation of the proposed methodology in "ABC Company" showed a 35% improvement in the cycle time of Production Line, a 33.6 increase in the Overall Equipment Effectiveness, and a 64% decrease in the number of defects units as was expected by the end of the RDMAIC (Risk Management plan, Define, Measure, Analysis, Improve, Control) implementation
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.18.06.Ph.D.2021.Ma.F (Browse shelf(Opens below)) Not for loan 01010110085202000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.18.06.Ph.D.2021.Ma.F (Browse shelf(Opens below)) 85202.CD Not for loan 01020110085202000

Thesis (Ph.D.) - Cairo University - Faculty of Graduate Studies for Statistical Research - Department of tatistical Quality Control and Quality Assurance

This dissertation investigated the development, implementation, and evaluation of a Continuous improvement methodology founded to improve the performance of any organization. A case study in Fast Moving Consumer Goods "FMCG" organization, called "ABC Company," provided the opportunity to assess the effects of the proposed integration between risk management and lean six-sigma methodology on the productivity indicators (measured by cycle time, Overall Equipment Effectiveness, and defects rate).The Case study was conducted in three phases: Model and Concepts Design, Data Collection, and Analysis leading to findings. During the research, validity was pursued using triangulation and theory to help maintain the Case under research control. Observing the proposed methodology "integration between risk management and lean six sigma" in a real organization allowed the researcher to describe the merging process between Risk management and Six Sigma methodology and their relationships with each other. The proposed methodology allowed treating causes of failure while executing improvement projects that improve performance and provide opportunities for successful implementation. The results of the implementation of the proposed methodology in "ABC Company" showed a 35% improvement in the cycle time of Production Line, a 33.6 increase in the Overall Equipment Effectiveness, and a 64% decrease in the number of defects units as was expected by the end of the RDMAIC (Risk Management plan, Define, Measure, Analysis, Improve, Control) implementation

Issued also as CD

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image