header
Local cover image
Local cover image
Image from OpenLibrary

A comparative study : Risk management for banking construction and general construction projects in Egypt / Fatma Abady Awade Abady ; Supervised Mohamed A. Shalaby , Ehab Abdel Atty Abdel Hafiz

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Fatma Abady Awade Abady , 2020Description: 95 P . : charts ; 30cmOther title:
  • دراسة مقارنة : إدارة المخاطر للمشروعات الإنشائية للبنوك والمشروعات الإنشائية العامة فى مصر [Added title page title]
Subject(s): Online resources: Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Mechanical Design and Production Summary: Summary: Risk management is a known as a three-stage process; risk identification, risk analysis, and risk actions. Therefore, this study is devoted to address the three-stages of risk management to both of General Construction and Banking Construction projects in Egypt. A Spearman Ranked Correlation test is applied to the two lists, and showed that risk factors for Banking is statistically different than those of the General Construction. A Design Structure Matrix (DSM) approach is used to identify the root risks among the overall top risks. A pool of risk actions is recommended, and their impact on the three project objectives are assessed by the multi criteria optimization method TOPSIS to choose the most effective few actions. The study key results present the top ranked risks for each for Banking and construction, their most effective actions, and compares such risks with internationally reported top risks
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.13.M.Sc.2020.Fa.C (Browse shelf(Opens below)) Not for loan 01010110082666000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.13.M.Sc.2020.Fa.C (Browse shelf(Opens below)) 82666.CD Not for loan 01020110082666000

Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Mechanical Design and Production

Summary: Risk management is a known as a three-stage process; risk identification, risk analysis, and risk actions. Therefore, this study is devoted to address the three-stages of risk management to both of General Construction and Banking Construction projects in Egypt. A Spearman Ranked Correlation test is applied to the two lists, and showed that risk factors for Banking is statistically different than those of the General Construction. A Design Structure Matrix (DSM) approach is used to identify the root risks among the overall top risks. A pool of risk actions is recommended, and their impact on the three project objectives are assessed by the multi criteria optimization method TOPSIS to choose the most effective few actions. The study key results present the top ranked risks for each for Banking and construction, their most effective actions, and compares such risks with internationally reported top risks

Issued also as CD

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image