Simulation of sediment transport in high Aswan Dam Lake / Rajaa Mohammed Sabri ; Supervised Mohamed S. El-Manadely , Mohamed H. El-Gamal
Material type:
- محاكاة حركة المواد الرسوبية في بحيرة السد العالي [Added title page title]
- Issued also as CD
Item type | Current library | Home library | Call number | Copy number | Status | Barcode | |
---|---|---|---|---|---|---|---|
![]() |
قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2014.Ra.S (Browse shelf(Opens below)) | Not for loan | 01010110065036000 | ||
![]() |
مخـــزن الرســائل الجـــامعية - البدروم | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2014.Ra.S (Browse shelf(Opens below)) | 65036.CD | Not for loan | 01020110065036000 |
Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
High Aswan Dam is the most important construction on the Nile River for water storage and control. The dam experiences sedimentation problem upstream the lake. The rate of reservoir sedimentation depends mainly on the size of a reservoir relative to the amount of sediment flowing into it. Through this study, a number of scenarios has been tested to numerically study the expected morphological changes that might take place in HADL as a result of the possible reduction of the incoming flow and/ or the sediment loads due to any possible dam construction activities upstream. The mathematical model was first verified to represent the conditions of the lake second; the model was evaluated then applied to the developed scenarios to predict the sediment transport in the longitudinal direction and sedimentation zone extension along the lake and to estimate of the expected total sediment volume
Issued also as CD
There are no comments on this title.