header
Image from OpenLibrary

Improving of progress ratios in project management using six Sigma methodology / Ahmed Ahmed Mahmoud Abdel Nabi ; Supervisied Hegazy Zaher

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Ahmed Ahmed Mahmoud Abdelnabi , 2018Description: 129 Leaves : charts ; 30cmOther title:
  • {uFEA9}{uFEAD}{uFE8D}{uFEB3}{uFE94} {uFEDF}{uFE98}{uFEA4}{uFEB4}{uFEF4}{uFEE6} {uFEE3}{uFECC}{uFEAA}{uFEFB}{uFE95} {uFE8D}{uFEDF}{uFE98}{uFED8}{uFEAA}{uFEE1} {uFED3}{uFEF2} {uFE8D}{uFEA9}{uFE8D}{uFEAD}{uFE93} {uFE8D}{uFEDF}{uFEE4}{uFEB8}{uFEAE}{uFEED}{uFECB}{uFE8E}{uFE95} {uFE91}{uFE8E}{uFEB3}{uFE98}{uFEA8}{uFEAA}{uFE8D}{uFEE1} {uFEE3}{uFEE8}{uFEEC}{uFEA0}{uFEF4}{uFE94} {uFE8D}{uFEDF}{uFEB4}{uFE98}{uFE94} {uFEB3}{uFEF4}{uFEA0}{uFEE4}{uFE8E} [Added title page title]
Subject(s): Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Institute of Statistical Studies and Research - Department of Statistical Quality Control and Quality Assurance Summary: This research aims to improve the progress ratios in projects management using the methodology of Six Sigma as a one of the most advanced techniques used in statistical analysis and improvement tools till now taking a case study of the maintenance projects held in an Oil Company. This research serve two branches, one of them is to enhance the ability of project management instead of the traditional ways by using a quality improvement tool which considered a modern use of this methodology which is the second filed that the research serves (Quality Improvement Techniques). The result of this research will act as one of the modern applications for the theory of Six Sigma as well as the practice of it in the practical life
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Date due Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.18.06.M.Sc.2018.Ah.I (Browse shelf(Opens below)) Not for loan 01010110076934000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.18.06.M.Sc.2018.Ah.I (Browse shelf(Opens below)) 76934.CD Not for loan 01020110076934000

Thesis (M.Sc.) - Cairo University - Institute of Statistical Studies and Research - Department of Statistical Quality Control and Quality Assurance

This research aims to improve the progress ratios in projects management using the methodology of Six Sigma as a one of the most advanced techniques used in statistical analysis and improvement tools till now taking a case study of the maintenance projects held in an Oil Company. This research serve two branches, one of them is to enhance the ability of project management instead of the traditional ways by using a quality improvement tool which considered a modern use of this methodology which is the second filed that the research serves (Quality Improvement Techniques). The result of this research will act as one of the modern applications for the theory of Six Sigma as well as the practice of it in the practical life

Issued also as CD

There are no comments on this title.

to post a comment.