Optimzing construction emissions for sustainable construction projects / Eslam Ahmed Tarek Mohammed Abdelkader ; Supervised Mohamed Mahdy Marzouk

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Eslam Ahmed Tarek Mohammed Abdelkader , 2016Description: 143 P. : charts , facimiles , photgraphs ; 30cmOther title:
  • إيجاد الحلول المثلى لترشيد الانبعاثات الناتجة من عمليات التشييد لتحقيق مشروعات أكثر إستدامة [Added title page title]
Subject(s): Online resources: Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering Summary: The rate of environmental pollution has reached extensive limits in the last few decades. There are huge amounts of environmental emissions associated with project life cycle phases. Moreover, construction industry consumes enormous amounts of energy. This research introduces Building Information Modeling (BIM) methodology to calculate execution time, life cycle cost, environmental impact and primary energy associated with construction alternatives. Monte Carlo simulation is introduced to account for variations in calculation of equivalent carbon dioxide emissions. Multi- objective optimization is performed using genetic algorithm taking into account four objective functions; project duration, project life cycle cost, project overall emissions and total project primary energy. Eight multi-criteria decision making techniques are presented to rank alternatives obtained from Pareto frontier points. The research introduces three group decision making techniques to provide final ranking of alternatives. Finally, sensitivity analysis is performed to determine the most sensitive attribute, the most sensitive measure of performance and the most sensitive stage of construction process that affects environmental emissions
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2016.Es.O (Browse shelf(Opens below)) Not for loan 01010110069647000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2016.Es.O (Browse shelf(Opens below)) 69647.CD Not for loan 01020110069647000

Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering

The rate of environmental pollution has reached extensive limits in the last few decades. There are huge amounts of environmental emissions associated with project life cycle phases. Moreover, construction industry consumes enormous amounts of energy. This research introduces Building Information Modeling (BIM) methodology to calculate execution time, life cycle cost, environmental impact and primary energy associated with construction alternatives. Monte Carlo simulation is introduced to account for variations in calculation of equivalent carbon dioxide emissions. Multi- objective optimization is performed using genetic algorithm taking into account four objective functions; project duration, project life cycle cost, project overall emissions and total project primary energy. Eight multi-criteria decision making techniques are presented to rank alternatives obtained from Pareto frontier points. The research introduces three group decision making techniques to provide final ranking of alternatives. Finally, sensitivity analysis is performed to determine the most sensitive attribute, the most sensitive measure of performance and the most sensitive stage of construction process that affects environmental emissions