header
Image from OpenLibrary

Assessment of risks in electrical plants and transmission lines projects in Libya / Hamza Mohamed Meftah Aldabar ; Supervised Mohamed Mahdy Marzouk

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Hamza Mohamed Meftah Aldabar , 2013Description: 102P. : charts ; 30cmOther title:
  • تقييم المخاطر فى مشاريع محطات وخطوط الكهرباء فى ليبيا [Added title page title]
Subject(s): Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering Summary: Electrical plants and transmission lines are constructed in major cities across Libya to meet high required demand problems. The aim of this research is to develop a comprehensive risk checklist associated with the construction of electrical plants and transmission lines projects in Libya. The research proposes a methodology to assess the risks at early stage of electrical plants and transmission lines projects
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Date due Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2013.Ha.A (Browse shelf(Opens below)) Not for loan 01010110060752000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2013.Ha.A (Browse shelf(Opens below)) 60752.CD Not for loan 01020110060752000

Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering

Electrical plants and transmission lines are constructed in major cities across Libya to meet high required demand problems. The aim of this research is to develop a comprehensive risk checklist associated with the construction of electrical plants and transmission lines projects in Libya. The research proposes a methodology to assess the risks at early stage of electrical plants and transmission lines projects

Issued also as CD

There are no comments on this title.

to post a comment.