header
Image from OpenLibrary

Enhancing safety management system for metro / Mohamed Ahmed Aboelela Helmy ; Supervised Abdelhadi Nabih , Elsaid Khater

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Mohamed Ahmed Aboelela Helmy , 2020Description: 49 Leaves : maps ; 30cmOther title:
  • تطوير منظومة إدارة السلامة بالمترو [Added title page title]
Subject(s): Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Graduate Studies for Statistical Research - Department of Statistics Quality Control and Quality Assurance Summary: Cairo is one of the most crowded cities in the world, thus its public transportation system is vital to transport people around the city, and the most important to move them in a safe and efficient way to meet their demands. Cairo Metro is one of the most important transportation system in Cairo, which transport more than 3 million passengers/day, in order to do that efficiently the current procedures implemented in metro should be compared to the procedures and standards used in EU countries and to propose areas of improvement as well. In this thesis, the current Metro situation of safety management system is going to be summarized in order to achieve the thesis purpose to support Cairo Metro in its endeavor to enhance its capacity. That will lead to decrease the number of annual accidents, incidents and even the near mess. In addition, the Improvement of safety system in Cairo Metro will be approached in order to facilitate its execution, and comparing with EU Safety Management System, starting from the current situation till the execution passing by all the necessary procedures to achieve the desired goal. Improving the safety culture of the workers as well as passengers will decrease the number of annual accidents. Finally, twinning project or technical assistance are two ways to achieve the desired target, there are set recommendations and considerations for guidance through the implementation of the target, which relies on technical and legal divisions, as well as clarifying the advantages and disadvantages of both twinning project and technical assistance
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Date due Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.18.06.M.Sc.2020.Mo.E (Browse shelf(Opens below)) Not for loan 01010110082184000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.18.06.M.Sc.2020.Mo.E (Browse shelf(Opens below)) 82184.CD Not for loan 01020110082184000

Thesis (M.Sc.) - Cairo University - Faculty of Graduate Studies for Statistical Research - Department of Statistics Quality Control and Quality Assurance

Cairo is one of the most crowded cities in the world, thus its public transportation system is vital to transport people around the city, and the most important to move them in a safe and efficient way to meet their demands. Cairo Metro is one of the most important transportation system in Cairo, which transport more than 3 million passengers/day, in order to do that efficiently the current procedures implemented in metro should be compared to the procedures and standards used in EU countries and to propose areas of improvement as well. In this thesis, the current Metro situation of safety management system is going to be summarized in order to achieve the thesis purpose to support Cairo Metro in its endeavor to enhance its capacity. That will lead to decrease the number of annual accidents, incidents and even the near mess. In addition, the Improvement of safety system in Cairo Metro will be approached in order to facilitate its execution, and comparing with EU Safety Management System, starting from the current situation till the execution passing by all the necessary procedures to achieve the desired goal. Improving the safety culture of the workers as well as passengers will decrease the number of annual accidents. Finally, twinning project or technical assistance are two ways to achieve the desired target, there are set recommendations and considerations for guidance through the implementation of the target, which relies on technical and legal divisions, as well as clarifying the advantages and disadvantages of both twinning project and technical assistance

Issued also as CD

There are no comments on this title.

to post a comment.