header
Local cover image
Local cover image
Image from OpenLibrary

Using 5D modelling in constructability assessment of traditional structures / Mohamed Moataz Elmarashly ; Supervised Hany Abdalla , Karim Eldash

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Mohamed Moataz Elmarashly, 2020Description: 82 P . : charts , facsmilies ; 30cmOther title:
  • استخدام النمذجة خماسية الأبعاد فى تقويم تشييدية المنشأت التقليدية [Added title page title]
Subject(s): Online resources: Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering Summary: Constructability Assessment application is necessary in all construction projects because it reduces conflicts, increases productivity and most importantly saves time as well as cost; resulting in practical and financial benefits.Construction sector is crucial to driving growth in the domestic economy and it`s a key to government`s plan for successful reforms. Unfortunately, the construction industry is unpredictable and there are many factors that can impact the project delivery success if they were overlooked.Therefore,the owner/designer/contractor must make sure that the project is constructible in the best possible manner and it is preferable to involve all the project parties since the beginning in integrated project delivery (IPD) approach.This research proposes a constructability assessment tool using 5D Building Information Modelling (BIM) incorporating selected 23 constructability factors.The platform helps giving an alert during all the project phases about the areas of concern which should be strengthened to enhance the constructability score. Two decision making techniques were used in the research to determine the overall constructability score of the project within the provided evaluation scheme.Constructability factors weightages are calculated using Analytic Hierarchy Process (AHP) and the utility values are calculated using Simple Multi Attribute Rating Technique (SMART)
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2020.Mo.U (Browse shelf(Opens below)) Not for loan 01010110082236000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2020.Mo.U (Browse shelf(Opens below)) 82236.CD Not for loan 01020110082236000

Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering

Constructability Assessment application is necessary in all construction projects because it reduces conflicts, increases productivity and most importantly saves time as well as cost; resulting in practical and financial benefits.Construction sector is crucial to driving growth in the domestic economy and it`s a key to government`s plan for successful reforms. Unfortunately, the construction industry is unpredictable and there are many factors that can impact the project delivery success if they were overlooked.Therefore,the owner/designer/contractor must make sure that the project is constructible in the best possible manner and it is preferable to involve all the project parties since the beginning in integrated project delivery (IPD) approach.This research proposes a constructability assessment tool using 5D Building Information Modelling (BIM) incorporating selected 23 constructability factors.The platform helps giving an alert during all the project phases about the areas of concern which should be strengthened to enhance the constructability score. Two decision making techniques were used in the research to determine the overall constructability score of the project within the provided evaluation scheme.Constructability factors weightages are calculated using Analytic Hierarchy Process (AHP) and the utility values are calculated using Simple Multi Attribute Rating Technique (SMART)

Issued also as CD

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image