000 04842namaa22004211i 4500
003 OSt
005 20250223033228.0
008 240306s2023 ||| |||frm||| 000 0 ara d
040 _aEG-GICUC
_bara
_cEG-GICUC
_dEG-GICUC
_erda
041 0 _aara
_bara
_beng
049 _aإيداع
082 0 4 _a346
092 _a346
_221
097 _aدكتوراه‎
099 _aCai01.04.06.Ph.D.2023.سا.م
100 0 _aسامـي مصطفــى عمَّــار الفرجانـي،
_eإعداد.
245 1 2 _aالمسؤوليــَّة المدنيـَّـة عَــنْ أعمَــالِ مُقـــاوِل البِنَــاءِ :
_bدراســـة مقارنـــة /
_cالباحــث سامـي مصطفــى عمَّــار الفرجانـي ؛ إشراف سعيد سلمان جبر.
246 1 5 _aCivil Liability for the Work of the Building Contractor «Comparative Study»
264 0 _c2023.
300 _a275 صفحة :
_c30 cm. +
_eCD.
336 _atext
_2rda content
337 _aUnmediated
_2rdamedia
338 _avolume
_2rdacarrier
502 _aأطروحة (دكتوراه)-جامعة القاهرة، 2023.
504 _aببليوجرافيا: صفحات 261-266.
520 _aمن خلال دراسة عقد مقاولة البناء والأحكام المنظِّمة له، لقد اشترط المشرِّع الليبي في المادة (650) مدني مسئولية كل من المقاول والمهندس المعماري عن الأخطاء التي تقع أثناء تنفيذ الالتزام، وذلك في مواجهة رب العمل باعتباره طرف ضعيف في العقد وجعل مدة الضمان عشرة سنوات من وقوع التهدُّم أو ظهور العيب، فالتسلم من قِبَل رب العمل لا ينتهي بموجبه مسئولية المقاول بل تستمر لمدة عشرة سنوات من تاريخ التسلُّم وثلاثة سنوات من ظهور العيب ولا يستطيع المقاول التخلص من المسئولية إلَّا عن طريق السبب الأجنبي، في ظهور العيب تقوم المسئولية على المقاول وهي قرينة قانونية قاطعة لا يستطيع التخلص منها، وقد افترض المشرع التضامن بين كل من المهندس المعماري والمقاول في مواجهة رب العمل. ويقع التزام على عاتق المقاول وهو تسليم العمل إلى رب العمل حسب المواصفات وكراسة الشروط في العقد خاليًا من أية عيوب وعلى رب العمل إعطاء الأجر إلى المقاول بمجرد تمام التسلُّم من قِبَله بدون تحفُّظ.
520 _aThrough the study of the construction contracting contract and the provisions regulating it, the Libyan legislator has stipulated in Article (650) civil the responsibility of both the contractor and the architect for errors that occur during the implementation of the obligation, in the face of the employer as a weak party to the contract and make the warranty period ten years from the occurrence of the demolition or the appearance of the defect, the receipt by the employer does not end under which the contractor's responsibility does not end, but continues for a period of ten years from the date of receipt and three years from the appearance of the defect The contractor can only get rid of liability through the foreign cause, in the appearance of the defect, the responsibility is based on the contractor, which is a conclusive legal presumption that he cannot get rid of, and the legislator has assumed solidarity between both the architect and the contractor in the face of the employer. The contractor has an obligation to deliver the work to the employer according to the specifications and the specifications in the contract free of any defects, and the employer must give the wage to the contractor as soon as it is received by him without reservation.
530 _aصدر ايضا كقرص مدمج
546 _aالنص بالعربية والملخص باللغة الإنجليزية والعربية.
650 7 _aالمسئولية المدنية
_2qrmak
650 7 _aالبناء
_2qrmak
_xرقابة
653 0 _aمقاول البناء
_aالمسؤلية المدنية
700 0 _aسعيد سلمان جبر
_eمشرف أطروحة.
900 _b01-01-2023
_cسعيد سلمان جبر
_dحســن حســين الـــبراوي
_dحمـــدي أحمــد سـعـــــد
_Uجامعة القاهرة
_Fكلية الحقـــوق
_Dقسم القانـــون المدنــي
905 _aYasmin
_eAfaf
942 _2ddc
_cTH
_e21
_n0
999 _c166400