000 | 04842namaa22004211i 4500 | ||
---|---|---|---|
003 | OSt | ||
005 | 20250223033228.0 | ||
008 | 240306s2023 ||| |||frm||| 000 0 ara d | ||
040 |
_aEG-GICUC _bara _cEG-GICUC _dEG-GICUC _erda |
||
041 | 0 |
_aara _bara _beng |
|
049 | _aإيداع | ||
082 | 0 | 4 | _a346 |
092 |
_a346 _221 |
||
097 | _aدكتوراه | ||
099 | _aCai01.04.06.Ph.D.2023.سا.م | ||
100 | 0 |
_aسامـي مصطفــى عمَّــار الفرجانـي، _eإعداد. |
|
245 | 1 | 2 |
_aالمسؤوليــَّة المدنيـَّـة عَــنْ أعمَــالِ مُقـــاوِل البِنَــاءِ : _bدراســـة مقارنـــة / _cالباحــث سامـي مصطفــى عمَّــار الفرجانـي ؛ إشراف سعيد سلمان جبر. |
246 | 1 | 5 | _aCivil Liability for the Work of the Building Contractor «Comparative Study» |
264 | 0 | _c2023. | |
300 |
_a275 صفحة : _c30 cm. + _eCD. |
||
336 |
_atext _2rda content |
||
337 |
_aUnmediated _2rdamedia |
||
338 |
_avolume _2rdacarrier |
||
502 | _aأطروحة (دكتوراه)-جامعة القاهرة، 2023. | ||
504 | _aببليوجرافيا: صفحات 261-266. | ||
520 | _aمن خلال دراسة عقد مقاولة البناء والأحكام المنظِّمة له، لقد اشترط المشرِّع الليبي في المادة (650) مدني مسئولية كل من المقاول والمهندس المعماري عن الأخطاء التي تقع أثناء تنفيذ الالتزام، وذلك في مواجهة رب العمل باعتباره طرف ضعيف في العقد وجعل مدة الضمان عشرة سنوات من وقوع التهدُّم أو ظهور العيب، فالتسلم من قِبَل رب العمل لا ينتهي بموجبه مسئولية المقاول بل تستمر لمدة عشرة سنوات من تاريخ التسلُّم وثلاثة سنوات من ظهور العيب ولا يستطيع المقاول التخلص من المسئولية إلَّا عن طريق السبب الأجنبي، في ظهور العيب تقوم المسئولية على المقاول وهي قرينة قانونية قاطعة لا يستطيع التخلص منها، وقد افترض المشرع التضامن بين كل من المهندس المعماري والمقاول في مواجهة رب العمل. ويقع التزام على عاتق المقاول وهو تسليم العمل إلى رب العمل حسب المواصفات وكراسة الشروط في العقد خاليًا من أية عيوب وعلى رب العمل إعطاء الأجر إلى المقاول بمجرد تمام التسلُّم من قِبَله بدون تحفُّظ. | ||
520 | _aThrough the study of the construction contracting contract and the provisions regulating it, the Libyan legislator has stipulated in Article (650) civil the responsibility of both the contractor and the architect for errors that occur during the implementation of the obligation, in the face of the employer as a weak party to the contract and make the warranty period ten years from the occurrence of the demolition or the appearance of the defect, the receipt by the employer does not end under which the contractor's responsibility does not end, but continues for a period of ten years from the date of receipt and three years from the appearance of the defect The contractor can only get rid of liability through the foreign cause, in the appearance of the defect, the responsibility is based on the contractor, which is a conclusive legal presumption that he cannot get rid of, and the legislator has assumed solidarity between both the architect and the contractor in the face of the employer. The contractor has an obligation to deliver the work to the employer according to the specifications and the specifications in the contract free of any defects, and the employer must give the wage to the contractor as soon as it is received by him without reservation. | ||
530 | _aصدر ايضا كقرص مدمج | ||
546 | _aالنص بالعربية والملخص باللغة الإنجليزية والعربية. | ||
650 | 7 |
_aالمسئولية المدنية _2qrmak |
|
650 | 7 |
_aالبناء _2qrmak _xرقابة |
|
653 | 0 |
_aمقاول البناء _aالمسؤلية المدنية |
|
700 | 0 |
_aسعيد سلمان جبر _eمشرف أطروحة. |
|
900 |
_b01-01-2023 _cسعيد سلمان جبر _dحســن حســين الـــبراوي _dحمـــدي أحمــد سـعـــــد _Uجامعة القاهرة _Fكلية الحقـــوق _Dقسم القانـــون المدنــي |
||
905 |
_aYasmin _eAfaf |
||
942 |
_2ddc _cTH _e21 _n0 |
||
999 | _c166400 |