000 015380000a22003370004500
003 EG-GICUC
005 20250223030108.0
008 061213s2006 ua d f m 000 0 eng d
040 _aEG-GICUC
_beng
_cEG-GICUC
041 0 _aEng
049 _aDeposite
097 _aPh.D
099 _aCai01.13.05.Ph.D.2006.Ah.E.
100 0 _aAhmed Mohamed Eldokhmasey
245 1 3 _aAn expert system for assessing engineering - related delay claims in construction projects /
_cAhmed Mohamed Eldokhmasey ; Supervised Moheeb Elsaid Ibrahim , Mohamed Mahdy Marzouk
246 1 5 _aنظام خبيرى لتقييم مطالبات التأخير الهندسية فى مشروعات التشييد
260 _aCairo :
_bAhmed Mohamed Eldokhmasey ,
_c2006
300 _a206P :
_bcharts ;
_c30cm
502 _aThesis (PH.D.) - Cairo University - Faculty Of Engineering - Department Of Civil Engineering
520 _aClaims and disputes are common problems , which are faced in construction projects These problems occur frequently during the project lifetime leading to litigation Delays are the most common and costly problem encountered in construction projects
530 _aIssued also as CD
653 4 _aassessing engineering
653 4 _aConstruction projects
653 4 _aConstruction projects
700 0 _aMohamed Mahdy Marzouk ,
_eSupervisor
700 0 _aMoheeb Elsaid Ibrahim ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf
905 _aAmira
_eCataloger
905 _aEsam
_eRevisor
942 _2ddc
_cTH
999 _c27390
_d27390