000 | 01623cam a2200337 a 4500 | ||
---|---|---|---|
003 | EG-GiCUC | ||
005 | 20250223030315.0 | ||
008 | 101031s2010 ua d f m 000 0 eng d | ||
040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
041 | 0 | _aeng | |
049 | _aDeposite | ||
097 | _aM.Sc | ||
099 | _aCai01.13.05.M.Sc.2010.Sa.L | ||
100 | 0 | _aSaad Fahad Aldosari | |
245 | 1 | 0 |
_aLife cycle assessment of Zenein and 6{u036D} {u036A} of october wastewater treatment plants / _cSaad Fahad Aldosari ; Supervised Hisham Abdelhalim , Mona M. Galal |
246 | 1 | 5 | _aتقييم الدورة الحياتية لمحطتى معالجة مياه الصرف الصحى بزنين و السادس من أكتوبر |
260 |
_aCairo : _bSaad Fahad Aldosari , _c2010 |
||
300 |
_a173 P. : _bcharts ; _c30cm |
||
502 | _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering | ||
520 | _aThe available alternatives for the treatment of munciple wastewaters have different operational characteristics. For instance , an alternative may require high energy consumption while another may need surplus construction material or wider land occupation. To compare between this alternatives , the researcher implemental the life cycle assessment methodology | ||
530 | _aIssued also as CD | ||
653 | 4 | _aEl-99 | |
653 | 4 | _aLCA | |
653 | 4 | _aWastewater treatment plants | |
700 | 0 |
_aHisham Abdelhalim , _eSupervisor |
|
700 | 0 |
_aMona Mohamed Galaleldin , _eSupervisor |
|
856 | _uhttp://172.23.153.220/th.pdf | ||
905 |
_aNazla _eRevisor |
||
905 |
_aSamia _eCataloger |
||
942 |
_2ddc _cTH |
||
999 |
_c31945 _d31945 |