000 | 01532cam a2200337 a 4500 | ||
---|---|---|---|
003 | EG-GiCUC | ||
005 | 20250223030337.0 | ||
008 | 110117s2010 ua dh f m 000 0 eng d | ||
040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
041 | 0 | _aeng | |
049 | _aDeposite | ||
097 | _aM.Sc | ||
099 | _aCai01.13.05.M.Sc.2010.Di.S | ||
100 | 0 | _aDina Ahmed Atef | |
245 | 1 | 2 |
_aA simulation - based planing system of wind turbines construction / _cDina Ahmed Atef ; Supervised Moheeb Elsaid Ibrahim , Hesham Osman |
246 | 1 | 5 | _aاستخدام المحاكاه لتخطيط عملية إنشاء تربينات الريح |
260 |
_aCairo : _bDina Ahmed Atef , _c2010 |
||
300 |
_a258P. : _bcharts , facsimiles ; _c30cm |
||
502 | _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering | ||
520 | _aWind turbine construction is a challenging undertaking due to the need to lift heavy loads to high locations in conditions of high and variable wind speeds . These conditions create great risks to contractors during the turbine assembly process . This research presents a simulation - based system to aid in the construction planning of wind turbines | ||
530 | _aIssued also as CD | ||
653 | 4 | _aSimulation | |
653 | 4 | _aWind speed | |
653 | 4 | _aWind Turbine | |
700 | 0 |
_aHesham Osman , _eSupervisor |
|
700 | 0 |
_aMoheeb Elsaid Ibrahim , _eSupervisor |
|
856 | _uhttp://172.23.153.220/th.pdf | ||
905 |
_aFatma _eCataloger |
||
905 |
_aNazla _eRevisor |
||
942 |
_2ddc _cTH |
||
999 |
_c32714 _d32714 |