000 | 01741cam a2200337 a 4500 | ||
---|---|---|---|
003 | EG-GiCUC | ||
005 | 20250223030400.0 | ||
008 | 110331s2010 ua d f m 000 0 eng d | ||
040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
041 | 0 | _aeng | |
049 | _aDeposite | ||
097 | _aM.Sc | ||
099 | _aCai01.13.05.M.Sc.2010.Mo.A | ||
100 | 0 | _aMohamed Hassan Mohamed Abdelaty | |
245 | 1 | 0 |
_aAirfield operational life prediction and payment factor due to pavement performance / _cMohamed Hassan Mohamed Abdelaty ; Supervised Laila Salah Radwan , Omar Osman Omar |
246 | 1 | 5 | _aالتنبؤ بالعمر التصميمى للمطارات وتطوير طريقة الدفع للمقاول بناء على أداء الرصف |
260 |
_aCairo : _bMohamed Hassan Mohamed Abdelaty , _c2010 |
||
300 |
_a146P. : _bcharts ; _c30cm |
||
502 | _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering | ||
520 | _aThis study aims to creating a new contractor payment method for airports construction works that depends on the actual as constructed pavement performance . To achieve this objective, a comparison between as constructed and as designed pavement sections was conducted by analyzing their performance using elastic layered method for flexible pavement and Finite element method for rigid pavement using latest software program based | ||
530 | _aIssued also as CD | ||
653 | 4 | _aAirfield Design life | |
653 | 4 | _aPavement performance | |
653 | 4 | _aPayment Factor | |
700 | 0 |
_aLaila Salah Radwan , _eSupervisor |
|
700 | 0 |
_aOmar Osman Omar , _eSupervisor |
|
856 | _uhttp://172.23.153.220/th.pdf | ||
905 |
_aFatma _eCataloger |
||
905 |
_aNazla _eRevisor |
||
942 |
_2ddc _cTH |
||
999 |
_c33541 _d33541 |