000 022210000a22003130004500
003 EG-GICUC
008 070103s2005 ua a f m 000 0 eng d
040 _aEG-GICUC
_beng
_cEG-GICUC
041 0 _aEng
049 _aDeposite
097 _aM.Sc
099 _aCai01.18.02.M.Sc.2005.Ma.S
100 0 _aManal Abd El kader Abd El fattah
245 1 0 _aSolving Planning Problems using Dimensional Modeling /
_cManal Abd El kader Abd El fattah ; Supervised Ibrahim Farag , Ali Hamid Elbastawisy
246 1 5 _aحل مشاكل التخطيط باستخدام نمذجة الابعاد
260 _aCairo :
_bManal Abd El kader Abd El fattah ,
_c2005
300 _a106P :
_bill ;
_c30cm
502 _aThesis (M.Sc.) - Cairo University - Institute Of Statistical Studies and Research (ISSR) - Department Of Computer and Information Sciences
520 _aToday Egyptian industry has been affected by many problems that caused industry obstacles that have significant impact on the Egyptian economy One of basic common problems to all manufactures is planning Planning types contain long - range planning , medium - range planning , and short - range planning ; each of them is complex by nature and need to be decomposed into smaller sub problems that are less complex , more structured and easier to be solved Capacity Requirements Planning (CRP) is one of the medium - range planning problems CRP is a detailed comparison of the capacity required by production plans versus the available production capacity and it determines how much labor and machine resources are required to accomplish the production plans If adequate capacity cannot be established , corrective actions should be taken When available capacity is insufficient despite corrective actions , the production planner reviews relative priorities and , working with marketing and production responsible , makes the difficult decisions required in revising the schedul
530 _aIssued also as CD
653 4 _aplanning
653 4 _aProblems
653 4 _aSolving
700 0 _aAli Hamid Elbastawisy ,
_eSupervisor
700 0 _aIbrahim Farag ,
_eSupervisor
905 _aAml
_eCataloger
905 _aEsam
_eRevisor
942 _2ddc
_cTH
999 _c36156
_d36156