000 | 01770cam a2200337 a 4500 | ||
---|---|---|---|
003 | EG-GiCUC | ||
005 | 20250223030827.0 | ||
008 | 130423s2013 ua dh f m 000 0 eng d | ||
040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
041 | 0 | _aeng | |
049 | _aDeposite | ||
097 | _aM.Sc | ||
099 | _aCai01.13.05.M.Sc.2013.Ma.P | ||
100 | 0 | _aMaged Mohamed Azab Swelam | |
245 | 1 | 0 |
_aProcurement methodology matrix as a tool of reducing conflicts and disputes in construction projects in Egypt / _cMaged Mohamed Azab Swelam ; Supervised Moheeb Elsaid , Ahmed Eldokhmasey |
246 | 1 | 5 | _aمصفوفة الأنماط التعاقدية كوسيلة لتقليل الخلافات فى مشاريع التشييد فى مصر |
260 |
_aCairo : _bMaged Mohamed Azab Swelam , _c2013 |
||
300 |
_a124P. : _bcharts , facsimiles ; _c30cm |
||
502 | _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering | ||
520 | _aThis research aimed to identify the main causes of disputes in medium , large and mega project in construction project in Egypt from the point of view of contractors , engineers and employers with respect to the procurement methodolgy . The results analysis concluded that to reduce conflicts , procurement methodology (Design Build/Lump Sum) is the most appropriate for commercial projects in Egypt ; the same has been obtained for real estate projects | ||
530 | _aIssued also as CD | ||
653 | 4 | _aConflicts | |
653 | 4 | _aProcurement methodology | |
653 | 4 | _aReducing | |
700 | 0 |
_aAhmed Mohamed Eldokhmasey , _eSupervisor |
|
700 | 0 |
_aMoheeb Elsaid Ibraheem , _eSupervisor |
|
856 | _uhttp://172.23.153.220/th.pdf | ||
905 |
_aFatma _eCataloger |
||
905 |
_aNazla _eRevisor |
||
942 |
_2ddc _cTH |
||
999 |
_c42748 _d42748 |