000 | 01707cam a2200349 a 4500 | ||
---|---|---|---|
003 | EG-GiCUC | ||
005 | 20250223030848.0 | ||
008 | 130915s2013 ua dh f m 000 0 eng d | ||
040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
041 | 0 | _aeng | |
049 | _aDeposite | ||
097 | _aM.Sc | ||
099 | _aCai01.13.12.M.Sc.2013.Mo.P | ||
100 | 0 | _aMohamed Esmat Abdelsamee Husin | |
245 | 1 | 0 |
_aPerformance analysis of beam pumping systems / _cMohamed Esmat Abdelsamee Husin ; Supervised Fouad Khalaf , Abdelalim Hashem , Abdelwaly Abdallah |
246 | 1 | 5 | _aتحليل أداء نظم الرفع الصناعى الترددى |
260 |
_aCairo : _bMohamed Esmat Abdelsamee Husin , _c2013 |
||
300 |
_a144P. : _bcharts , facsimiles ; _c30cm |
||
502 | _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Metallurgical Engineering | ||
520 | _aThe aim of study was to analyze beam pumping system problems encountered in Agiba Company during last ten years ending with modified design rules that were learnt . Total failure frequency dropped from 4 to 2.25 failures / well / year. Atotal system down time improvement of 43% together with production losses saving of 44% was achieved. A simple friendly expert system was developed and validated to diagnose and troubleshoot system problems | ||
530 | _aIssued also as CD | ||
653 | 4 | _aBeam pumping expert | |
653 | 4 | _aMetallurgical | |
653 | 4 | _aSystems analysis | |
700 | 0 |
_aAbdelalim Hashem , _eSupervisor |
|
700 | 0 |
_aAbdelwaly Abdallah , _eSupervisor |
|
700 | 0 |
_aFouad Khalaf , _eSupervisor |
|
856 | _uhttp://172.23.153.220/th.pdf | ||
905 |
_aNazla _eRevisor |
||
905 |
_aSoheir _eCataloger |
||
942 |
_2ddc _cTH |
||
999 |
_c43502 _d43502 |