000 01707cam a2200349 a 4500
003 EG-GiCUC
005 20250223030848.0
008 130915s2013 ua dh f m 000 0 eng d
040 _aEG-GiCUC
_beng
_cEG-GiCUC
041 0 _aeng
049 _aDeposite
097 _aM.Sc
099 _aCai01.13.12.M.Sc.2013.Mo.P
100 0 _aMohamed Esmat Abdelsamee Husin
245 1 0 _aPerformance analysis of beam pumping systems /
_cMohamed Esmat Abdelsamee Husin ; Supervised Fouad Khalaf , Abdelalim Hashem , Abdelwaly Abdallah
246 1 5 _aتحليل أداء نظم الرفع الصناعى الترددى
260 _aCairo :
_bMohamed Esmat Abdelsamee Husin ,
_c2013
300 _a144P. :
_bcharts , facsimiles ;
_c30cm
502 _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Metallurgical Engineering
520 _aThe aim of study was to analyze beam pumping system problems encountered in Agiba Company during last ten years ending with modified design rules that were learnt . Total failure frequency dropped from 4 to 2.25 failures / well / year. Atotal system down time improvement of 43% together with production losses saving of 44% was achieved. A simple friendly expert system was developed and validated to diagnose and troubleshoot system problems
530 _aIssued also as CD
653 4 _aBeam pumping expert
653 4 _aMetallurgical
653 4 _aSystems analysis
700 0 _aAbdelalim Hashem ,
_eSupervisor
700 0 _aAbdelwaly Abdallah ,
_eSupervisor
700 0 _aFouad Khalaf ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf
905 _aNazla
_eRevisor
905 _aSoheir
_eCataloger
942 _2ddc
_cTH
999 _c43502
_d43502